My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Everett 01 26 02-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />SECTION 01 26 02 <br />RFI TEMPLATE <br />REQUEST FOR INFORMATION <br /> <br />To Project <br />Manager: <br /> <br /> From Contractor: <br />Signature: <br /> <br /> <br />Document Reference: (Drawing Sheet, Detail No. / Spec. Section) <br /> <br /> Architectural Civil Structural Mechanical Electrical Other <br />_________________________ <br /> <br />Request / Recommended Solution: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Attachments <br />Date Required For Response: Initiated By: <br /> (Name) (Firm) <br /> <br />Engineers Response: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Attachments <br />Response By: Firm: Date: <br />NOTE: This is not an authorization to proceed with work involving additional cost and/or time. <br />Notification must be given in accordance with the Contract Documents if any response <br />causes any change to the Contract Sum and/or Contract Time. <br /> <br />Copies: Owner’s Representative Consultant __________________ <br /> Other________________ File <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.