My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Everett 01 35 53-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />SECTION 01 35 53 <br />SECURITY PROCEDURES <br />PART 1 : GENERAL <br />1.01 SUMMARY <br />A. This Section includes the procedures to maintain security including unauthorized <br />entry, vandalism, and theft to buildings and grounds at Project site. <br />1.02 SECURITY PROGRAM <br />A. At the Preconstruction Meeting specified in Section 01 31 19 - Project Meetings, <br />discuss with the City a security program to prevent unauthorized entry and to <br />protect against other security problems, including loss due to theft, vandalism, <br />and fire. <br />B. Arrange with the City for access through locked gates as necessary to perform <br />the Work of this Contract. <br />1.03 STORAGE AND PROTECTION <br />A. Provide for secure lockup of stored materials and take additional measures to <br />protect against theft vandalism, and other loss of property belonging to the City <br />located on site and at off-site facilities. <br />1.04 ENTRY CONTROL <br />A. The Contractor will be given access into the facility by the City’s representative. <br />Contractor is expected to maintain site security and lock gates outside of <br />established working hours. <br />B. Restrict entrance of unauthorized persons and vehicles into construction areas. <br />C. Maintain security of City gates as approved by the City in advance. <br />D. Maintain security site lighting systems as approved by the City in advance. <br />PART 2 : PRODUCTS <br />Not Used. <br />PART 3 : EXECUTION <br />Not Used. <br />END OF SECTION 01 35 53
The URL can be used to link to this page
Your browser does not support the video tag.