Laserfiche WebLink
CERTIFICATE PAGE City of Everett WFP Air Scour Blower Building Replacement The engineering material and data contained in the Plans and Specifications were prepared under the supervision and direction of the undersigned, whose seal as a registered professional engineer is affixed below. Specifications: Divisions 00, 01, and 31 John F. Gillespie III, P.E. BHC Consultants, LLC Specifications: Division 26 and 28 Jeffrey S. Gibson, P.E. BHC Consultants, LLC Specifications: Division 40 Cameron Robert Ochiltree, P.E. BHC Consultants, LLC 06/03/2024 <br />06/03/2024 <br />06/03/2024