My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Everett 00 61 23-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />SECTION 00 61 23 <br />NEW RETAINAGE BOND <br />BOND NO. _________ <br />RETAINAGE BOND <br /> <br /> <br />KNOW ALL MEN BY THESE PRESENTS, that __________________, a corporation <br />organized under the laws of the State of _____________________, and registered to do <br />business in the State of Washington as a contractor, as Principal, and <br />________________________, a corporation organized under the laws of the State of <br />_____________________________ and registered to transact business in the State of <br />Washington as Surety, their heirs, executors, administrators, successors and assigns, are jointly <br />and severally held and bound to the City of Everett, Washington, hereinafter called “City”, and <br />are similarly held and bound unto the beneficiaries of the trust fund created by RCW Chapter <br />60.28, in the sum of _______________________________Dollars ($_____________) plus five <br />(5%) percent of any increases that may occur under the Contract (as defined below), the <br />payment of which, well and truly to be paid, we bind ourselves, our heirs, executors and <br />successors, jointly and severally, formally by these presents. <br />THE CONDITIONS OF THE ABOVE OBLIGATION ARE THAT: <br />WHEREAS, the Principal has executed a contract ___________ (the “Contract”) with the City <br />known as: <br /> <br />PROJECT NAME: WFP AIR SCOUR BLOWER BUILDING REPLACEMENT <br />CONTRACT NUMBER: UP 3813 <br />WHEREAS, said Contract and RCW Chapter 60.28 require the City to withhold from monies <br />earned by the Principal during the progress of the construction, hereinafter referred to as <br />“earned retained funds”; <br />WHEREAS, the Principal requested that the City accept a retainage bond and release earned <br />retained funds to Principal, as allowed under RCW Chapter 60.28; and <br />NOW, THEREFORE, the condition of this obligation is such that the Surety is held and bound to <br />the City to indemnify, defend and hold the City harmless from any and all loss, costs or <br />damages that the City may sustain by reason of release of said earned retained funds to <br />Principal, then this obligation to be null and void, otherwise to remain in full force and effect.
The URL can be used to link to this page
Your browser does not support the video tag.