Laserfiche WebLink
Section 00 63 63 CHANGE ORDER - AGREED <br /> <br />City of Everett 00 63 63-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Change Order No._________________________ <br />Change Order Effective Date:________________ <br /> <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. The amount of this Change Order for the changes described in Exhibit A, represents <br />complete compensation for the changes described in Exhibit A, including all direct and <br />indirect costs and impacts. The Contract Sum shall be adjusted as described in this <br />Change Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br />Mayor or his designee is authorized to direct Contractor to perform additional work. In <br />calculating such threshold amounts, Washington State sales tax, as applicable to the <br />Work, has been considered. <br />4. The Contract Time of the Contract shall be adjusted to the extent described in this <br />Change Order. <br />5. Contractor waives and releases any and all claims arising out of, or related to, this <br />Change Order, the work described in Exhibit A, and all work and actual or constructive <br />changes that occurred or began prior to the date of this Change Order, including, but <br />not limited to, claims for equitable adjustment of time and compensation, delay, <br />impact, overhead, or inefficiencies. This provision does not apply to requests for <br />equitable adjustment of time or price for which the Contractor timely and properly <br />provided notice of a differing site condition, protest, dispute, claim or Contract Claim as <br />required by the Contract Documents. If the Contract Documents establish a time <br />period for notice of a differing site condition, protest, dispute, claim, or Contract Claim <br />that ends after the date of this Change Order, but relates to work performed prior to <br />the date of this Change Order, then this provision does not apply if the Contractor <br />timely and properly submits such notice. <br />6. This Change Order only changes the contract between Contractor and City to the <br />extent explicitly provided herein. <br />7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br />means, in which case such signature(s) will have the same effect as an original ink <br />signature. This Change Order may be signed in counterparts, each of which shall be <br />deemed an original, and all of which, taken together, shall be deemed one and the <br />same document. <br />