My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 63 95 CHANGE ORDER - UNILATERAL <br /> <br />City of Everett 00 63 95-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br /> <br />Change Order No._________________________ <br />Change Order Effective Date:________________ <br /> <br />As allowed by the contract, the City directs the Contractor as follows: <br />1. The Scope of Work shall be changed to the extent described in Exhibit A. <br />2. The Contract Sum shall be adjusted as described in this Change Order. <br />3. The Contract Time of the Contract, and contractually scheduled completion date, shall <br />be adjusted to the extent described in this Change Order. <br />4. Unless the Contractor timely and properly follows the procedures in the Contract <br />Documents for seeking further equitable adjustment of time and compensation, <br />including, but not limited to, delays, impacts, inefficiencies, overhead, and direct and <br />indirect costs, and except as otherwise expressly provided herein, the Contractor will <br />be barred from (a) asserting any claim for further adjustment of time and compensation <br />arising out of, or relating to, the charges described in this Change Order or Work <br />described in Exhibit A and (b) asserting an equitable adjustment of time or price arising <br />earlier than the date of this Change Order. This provision does not apply to requests <br />for equitable adjustment of time or price for which the Contractor timely and properly <br />provided notice of a differing site condition, protest, dispute, claim or Contract Claim as <br />required by the Contract Documents. If the Contract Documents establish a time <br />period for notice of a differing site condition, protest, dispute, claim, or Contract Claim <br />that ends after the date of this Change Order, but relates to work performed prior to <br />the date of this Change Order, then this provision does not apply if the Contractor <br />timely and properly submits such notice. <br />5. This Change Order only changes the Contract between Contractor and City to the <br />extent explicitly provided herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.