My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />1. GENERAL INFORMATION <br />1.1 DEFINITIONS OF WORDS AND TERMS <br />Where used in the Contract Documents, the following words and terms shall have the meanings <br />indicated. The meanings shall be applicable to the singular, plural, masculine and feminine of all <br />words and terms. <br />Addenda: Written or graphic instruments issued prior to the opening of Bids that clarify, correct, <br />or change the Bidding Requirements or the proposed Contract Documents. <br />Additive: A supplemental unit of work or group of bid items, identified separately in the Bid <br />Form, that may, at the discretion of the City, be awarded in addition to the base Bid. <br />Alternative or Alternate: One of two or more units of Work or groups of bid items, identified <br />separately in the Bid Form, from which the City may make a choice between different methods <br />or material of construction for performing the same Work. <br />Application for Payment: Form acceptable to Owner that Contractor is to use during the <br />course of the Work in requesting progress or final payments that is to be accompanied by such <br />supporting documentation as is required by the Contract Documents. <br />Architect: An individual or entity retained by the Owner to be the Owner’s representative with <br />regard to matters of design intent. The terms “Owner’s Representative”, “Engineer” and <br />“Architect” are interchangeable. <br />Award Date: The date of the formal action by the Everett City Council to accept the lowest <br />responsible and responsive Bidder for the Work. <br />Bid: The offer or proposal of a bidder submitted on the prescribed form setting forth the prices <br />for the Work to be performed. <br />Bid Form: The form provided to Bidders by the City for submittal of a Proposal or Bid to the City <br />for a specific project. <br />Bidder: An individual, partnership, firm, corporation, or joint venture, submitting a Bid. <br />Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br />Call for Bids (Advertisement for Bids): The published public notice soliciting or Bids for Work <br />stating, among other things, the time, place, and date for receiving and opening the Bids. <br />Change Order: Reference to Change Order shall include all rights of the Owner and Contractor <br />under ARTICLE 6. CHANGES. <br />Completion Date: Date on which Project is ready for Final Acceptance. All physical Work, <br />including Punch List, is complete and Contractor has completed and fulfilled all contractual <br />obligations except any maintenance of landscaping. Contractual obligations that must be fulfilled <br />prior to achievement of the Completion Date include, but are not limited to, the Contractor’s <br />furnishing all documentation (including correct, complete and accurate as-built or record <br />drawings) and operation and maintenance manuals and transfer of warranties. <br />Contract: Agreement signed by the Owner and Contractor (Section 00 52 13). Depending on <br />context, “Contract” may also refer to the Contract Documents as a whole. Contract Documents <br />are defined in section 1.2 below. <br />Contract Claim: Any request by the Contractor for additional time or money (adjustment of <br />Contract Sum or Contract Time) irrespective of the cause or reason for the request. Contract <br />Claims include, but are not limited to, requests by the Contractor for additional time or money <br />due to Extra Work, inefficiencies, Delays, interferences, and problems with the design. Contract <br />Claim includes, but is not limited to, claims or requests by Subcontractors for extensions of
The URL can be used to link to this page
Your browser does not support the video tag.