My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-3 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Notice: A signed, written communication by the Contractor to the Owner as described in <br />ARTICLE 10. NOTICE TO OWNER. <br />Notice of Award: The written notice from the City of Everett to the successful Bidder signifying <br />the City’s acceptance of the Bid. No Contract is formed until the Effective Date. <br />Notice to Proceed: The written Notice from the Owner or Owner’s Representative to the <br />Contractor authorizing and directing the Contractor to proceed with the Work and establishing <br />the date on which the Contract Time begins. Multiple and partial Notices to Proceed may be <br />issued on a single Project. <br />Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor <br />performs more overall Work than it otherwise would have performed. <br />Overhead: For the purpose of calculating additional compensation under this section of the <br />Contract, Overhead shall include only those costs that are expended for the administration of <br />the business as a whole. Such costs usually accrue or are incurred due to the passage of time, <br />and cannot be traced to a particular project or Contract. Examples of possible Overhead costs <br />include, but are not limited to, General and Administrative salaries and benefits, rent, general <br />company insurance (exclusive of insurance on owned equipment that is directly job costed), <br />depreciation on office facilities, utilities, maintenance, office supplies, general company <br />accounting and legal fees (exclusive of amounts expended directly on any specific project), <br />personal property taxes, general company business licenses, dues and subscriptions. <br />The following costs and expenses are excluded from the definition and calculation of Overhead. <br />Overhead costs that vary substantially with the volume of Work performed (as measured by <br />billings) shall not be included in Overhead for the purpose of determining additional <br />compensation for Extended or Unabsorbed Home Office Overhead or both. <br />Examples of costs that are not included in Overhead include, but are not limited to, travel and <br />business meetings, telephones, professional fees expended for the benefit of a specific project, <br />union welfare benefits, payroll taxes and equipment rental. <br />If related party transactions are included in a Contractor’s Overhead, they shall be explicitly <br />identified as related party transactions and shall not exceed amounts that would be incurred in <br />an arms-length transaction for the provision of the same or similar goods and services. If such <br />transactions exist and the amounts paid by the Contractor and included in Overhead are in <br />excess of that which would normally be expended in an arms-length transaction, an adjustment, <br />in the form of a reduction in the amount for calculation purposes, shall be included in any <br />calculation in determining the amount of Allocable Overhead. <br />Overhead shall not include any cost directly attributable to a particular project. If a cost can be <br />traced to a particular Contract, the Contractor may not classify the cost as Overhead. <br />Indirect or home office costs that vary substantially with the amount of Work performed shall not <br />be included in the group of costs comprising Overhead. <br />Overhead shall not include costs specifically disallowed by Federal Acquisition Regulations, <br />Subpart 31.2 – Contracts with Commercial Organizations, or its successor. Further, “Overhead” <br />shall not include the costs of “field support services” that are more closely direct costs in nature, <br />regardless of the manner in which the Contractor normally accounts for such costs. An example <br />of such disallowed cost would be for material handling and expediting, which are costs incurred <br />for the direct support and benefit of specific project(s). <br />In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of <br />specific costs not allowed in a calculation under this section of the Contract include, but are not <br />limited to, Incentive Compensation paid to personnel classified as Overhead and otherwise <br />includable under this section of Contract, travel and business meetings, employer paid benefits
The URL can be used to link to this page
Your browser does not support the video tag.