Laserfiche WebLink
BRICKS : MINIFIGS WALL AND WINDOWELEVATIONS <br /> FASTS/GNS. <br /> 32'-4" PROPOSED WALL SIGN #1 : EVERETT <br /> LEASED FACADE SPACE <br /> 163" 53.2 SQ. FT. <br /> SIGN WIDTH SEE PAGE 4 OF 5 FOR DETAILS • ' ' <br /> CLIENT: <br /> BRICKS & MINIFIGS <br /> SCOPE : <br /> ROOF • WALL SIGN, <br /> LINE ILLUMINATED. <br /> VINYL WINDOW SIGNS <br /> 785/$" SIGN • , o ' PROPOSED WALL SIGNS #2: <br /> HEIGHT" PROJECT: <br /> LESS THAN 25% OF SIGN PERMIT <br /> WINDOWS. <br /> VERSION. <br /> ` SEE PAGE 5 OF 5 1---1 6'-2" SIGN ELEVATION 20,_4„ FOR DETAILS <br /> PROJECT MANAGER: <br /> ' �i' t1► DANIEL ALBERT <br /> ENGINEER : <br /> DUANE STEIG <br /> it <br /> J <br /> East Elevation <br /> Scale: 3/16" = 1'-0" <br /> BY <br /> FACADE AREA: ` City of Everett Permit Review DATE <br /> 32'-4" X 20'-4" = 657.27 SQ. FT. X . 15 = 98.6 SQ. FT. ALLOWED SIGNAGE EVERETT Status: Reviewed for Permit AS SHOWN <br /> WASHINGTON <br /> 03/12/2024 2:24:28 PM WITH REVISIONS AS NOTED <br /> SIGN CODE Table 36-2: Freestanding Signs and Wall Signs <br /> SIGN CATEGORY A: Greater of 48 s.f. or 15% of the area of the building facade up to a maximum of 300 s.f. <br /> 19.36.050 Development standards for specific sign types. ' <br /> E. Window Signs. <br /> 1. Maximum Size. Permanent and temporary window signs are limited to a maximum of twenty-five percent of the window area. <br /> 4. Window signs shall not be included in the calculation of sign area for wall signs. <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility.Before giving approval,please examine all proofs carefully for the accuracy of information presented,as well as spelling,punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout.In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed. If further Page 3 of S <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />