Laserfiche WebLink
FASTS/GNS® <br />ELEVATION <br />(NOT TO SCALE) <br />PROPOSED SIGN 1 <br />PROJECTING SIGN, INTER ALLY LED ILLUMINATED <br />DISTANCE FROM WALL: 4" + 46" = 50" / 4.2 FEET <br />SIGN FACE AREA: 46"W X 30"H X 5"DEEP <br />= 46" X 30" = 1,380 SQ. IN. / 144 = 9.58 SQ. FT. <br />rr 46" <br />SIGN CODE 19.36.050 Development standards for specific sign types. <br />CHECKLIST. F 1. Projecting signs shall not exceed twenty-four square feet in area. Exception: In the MU zone in <br />Metro Everett, there shall be no size limitations for projecting signs on designated transit - <br />oriented development (TOD) streets or pedestrian streets unless otherwise noted herein. ` City of Everett Permit Review <br />2. Projection. <br />z/ a. Horizontal oriented signs: no more than eight feet. EVERETT Status: Reviewed for Permit <br />b. Vertically oriented signs: no more than three feet. <br />c. Signs may project into a public right-of-way for storefront buildings, subject to a right-of-way use permit. 03/01/2024 11:43:04 AM <br />d. Minimum clearance above grade shall be eight feet. <br />EVERETT <br />CLIENT: <br />HIGH SOCIETY PRO <br />SHOP <br />FILE NAME: <br />PROJECTING WALLS IGN, <br />ILLUMINATED. <br />PROJECT: <br />SIGN PERMIT <br />VERSION: <br />1 <br />j: 01/31/2024i <br />PROJECT MANAGER: <br />IKrystina Weatherson <br />DESIGNER: <br />TSP/DUANE STEIG <br />APPROVAL BY <br />DATE <br />AS SHOWN <br />WITH REVISIONS AS NOTED <br />At FASTSIGNS, we take pride in precision, but the final examination for accuracy is your responsibility. Before giving approval, please examine all proofs carefully for the accuracy of information presented, as well as spelling, punctuation, <br />numbers, graphics, colors, room numbers, install locations and general layout. In the event that we have miscommunicated regarding your original design, we will be happy to provide a second proof free of charge if needed. If further <br />revisions are required after approval has been received, additional charges will be incurred. Our normal production cycle will begin from the date approval is received. We cannot accept changes or approvals verbally. <br />Page 4 of S <br />