Laserfiche WebLink
GENERAL NOTES AERIAL VIEW <br /> CODE AND STANDARDS •�• der ' • <br /> 1.ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE(NEC),2015 INTERNATIONAL BUILDING CODE BLUE RAVEN <br /> (IBC),2015 INTERNATIONAL RESIDENTIAL CODE(IRC),2015 INTERNATIONAL PLUMBING CODE(IPC),AND ALL STATE <br /> AND LOCAL BUILDING,ELECTRICAL,AND PLUMBING CODES. <br /> 2.DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. q <br /> f+ 1403 N. Research Way <br /> SITE NOTES/OSHA REGULATION Orem, UT 84097 <br /> 1.A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 800.377.4480 <br /> 2.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM. WWW.BLUERAVENSOLAR.COM <br /> 3.THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING,MECHANICAL,OR BUILDING ROOF VENTS. <br /> 4.ROOF COVERINGS SHALL BE DESIGNED,INSTALLED,AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND CONFIDENTIAL-THE INFORMATION <br /> THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT HEREIN CONTAINED SHALL NOT BE <br /> THE BUILDING OR STRUCTURE. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> 6 SHALL IT BE DISCLOSED IN WHOLE OR <br /> SOLAR CONTRACTOR 4 . IN PART TO OTHERS OUTSIDE <br /> 1.MODULE CERTIFICATIONS WILL INCLUDE UL1703,IEC61646,IEC61730. RECIPIENTS ORGANIZATION,EXCEPT <br /> 2.IF APPLICABLE,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER IN CONNECTION WITH THE SALE AND <br /> THE MANUFACTURER'S INSTALLATION REQUIREMENTS. USE OF THE RESPECTIVE EQUIPMENT, <br /> 3.AS INDICATED BY DESIGN,OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF - WITHOUT THE WRITTEN PERMISSION <br /> STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. OF BLUE RAVEN SOLAR LLC. <br /> 4.CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO <br /> LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. <br /> 5.CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A _ _ 1 NAB C E P <br /> SUITABLE SEALING COMPOUND. <br /> 6.DC WIRING LIMITED TO MODULE FOOTPRINT W/ENPHASE AC SYSTEM. CERTIFIED] <br /> 7.ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/SUITABLE WIRING CLIPS. <br /> 8.MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOTAVAIPV INSTALLATION <br /> .\ <br /> BLE. <br /> 9.ALL INVERTERS,MOTOR GENERATORS,PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS,AC PROFESSIONAL <br /> PHOTOVOLTAIC MODULES,DC COMBINERS,DC-TO-DC CONVERTERS,SOURCE CIRCUIT COMBINERS,AND , 0 Scott Gurney <br /> CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND • #PV-011719-015866 <br /> LISTED FOR THE APPLICATION PER NEC 690.4(B). • <br /> 10.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. + w CONTRACTOR: <br /> 11.TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS(WHEN PROVIDED) S BRS FIELD OPS <br /> IN ACCORDANCE WITH NEC CODE 110.14(D)ON ALL ELECTRICAL CONNECTIONS. -' Sealed For <br /> EQUIPMENT LOCATIONS <br /> � 0 Existing Roof & 800-377-4480 <br /> 1.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT s� Attachment Only <br /> WILL BE PROVIDED AS PER SECTION NEC 110.26. <br /> 2.EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS <br /> SPECIFIED BY NEC 690.31(A)AND NEC TABLE 310.15(B). �►. y <br /> 3.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC U <br /> APPLICABLE CODES. Z Q Q <br /> 4.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. <br /> O <br /> 0 CN <br /> A- C.gjL - Q rn rn � <br /> PROJECT INFORMATION: � � , r ti0 °4was�ti e 0 C: M <br /> A <br /> NUMBER OF STORIES: 1 O W W <br /> CONDUIT RUN: Exterior / LL. 73 !E N N <br /> ECOBEE QTY: 1 Z O 2 co N (j) <br /> LIGHT BULB QTY: 18 f0 056 co > W <br /> PV METER: Not Required DESIGN CRITERIA SITE SPECIFICATIONS SHEET INDEX �� �'Fc�s- �� ��Q ca H F_ <br /> ROOF TYPE (1) INFORMATION: �SS�O/vq�FTv�' O X W N <br /> ROOF TYPE: Comp Shingle WIND SPEED: 110 mph CONSTRUCTION -V-B PV1 -COVER SHEET � Cl) <br /> FRAMING TYPE: Rafter GROUND SNOW LOAD: 25 Ib/ft2 ZONING: RESIDENTIAL PV2-SITE PLAN Cl) C LID O N W <br /> WIND EXPOSURE FACTOR: C PV3- ROOF PLAN � _r_ 00 > V U <br /> SHEATHING TYPE: PLYWOOD U W 0-) Lu Q <br /> ATTACHMENT: SFM InfinityFlashkit SEISMIC DESIGN CATEGORY: D PV4-STRUCTURAL <br /> LINE DIAGRAM 5i22i23 <br /> PV6- ELECTRICAL C <br /> RACKING: Unirac SFM Infinity @ 48" OC Portrait/72"OC Landscape PV5- ELECTRICAL <br /> CALCULATIONS DRAWING BY: <br /> NUMBER OF ATTACHMENTS: 28 SCOPE OF WORK <br /> PV7-WARNING LABELS AND LOCATIONS Brendan Fillmore <br /> ROOF TYPE (2) INFORMATION (IFAPPLICABLE): INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY (ALL OTHER SHEETS AS REQUIRED) <br /> NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SS- PRODUCT SPEC. SHEETS Digitally signed by John PLOT DATE: <br /> *SEE PV4.2 A.Calvert May 17, 2023 <br /> Date:2023.05.22 <br /> SYSTEM TO BE INSTALLED INFORMATION: UTILITY COMPANY: 12:12:33-06'00' PROJECT NUMBER: <br /> 764787 <br /> DC SYSTEM SIZE: 4.4 kW DC Snohomish County Public Utilities District <br /> AC SYSTEM SIZE: 3.19 kW AC (PUD) SHEET NAME: <br /> MODULE TYPE: (11) QCells Q.PEAK DUO BILK ML-G10+/t 400 COVER SHEET <br /> INVERTER TYPE: Enphase IQ8A-72-2-US <br /> MONITORING: Enphase IQ Combiner 4 X-IQ-AM1-240-4 PERMIT ISSUER: REVISION: PAGE NUMBER: <br /> City of Everett 0 PV 1 <br />