My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 W CASINO RD 2024-10-11
>
Address Records
>
W CASINO RD
>
1
>
1 W CASINO RD 2024-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 10:26:21 AM
Creation date
9/6/2024 1:30:26 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 2/7/2024 <br /> City of Everett Permit Services Public Works Permit#: PW2402-011 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $115.00 <br /> WASHINGTON PermitSeryices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control.......................................................................$50.00 <br /> Misc. Minor Permit(Work in ROW).......................................$25.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br /> all claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other <br /> right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br /> thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br /> This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration <br /> date 180 days to keep the permit open while work is active. <br /> Page 2 of 2 <br /> —APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.