Laserfiche WebLink
PUB WORKS PERMIT Date Applied: 9/8/2023 <br /> ■ Public Works Permit#: PW2309-008 <br /> City of Everett Permit Services <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B2306-015 <br /> EVERETT Everett, WA 98201 Planning Reference#: REVI23-074 <br /> everettwa.gov/permits Public Works Fee: $399.05 <br /> WASHINGTON PermitServices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> LYMAN ANDREW R&COOK KATHERINE A GOLESH ARCHITECTURE <br /> 1403 ROCKEFELLER AVE <br /> EVERETT,WA 98201-1633 <br /> PHONE: PHONE:2067513969 <br /> SITE ADDRESS: 1403 ROCKEFELLER AVE TAX PARCEL ID#:29051700301600 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE WORK FOR SFR ADDITION/DRIVEWAY <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4.` Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure thatstormwater runoff from new/replaced impervious surfaces will be managed on-site <br /> in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure.Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12. A Declaration of Covenant for Stormwater BMPs shall be submitted to the City prior to final approval/closeout of the permit. <br /> 13. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> _ suE <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control $50.00 a <br /> Paving 986 SF) $45.00 <br /> PW Plan Review $20.00 OCT 1 1 2023 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee(986 SF) $264.05 <br /> CITY OF EVERETT <br /> Permit Services <br /> Page 1 of 2 <br /> APPLICANT/JOB SITE COPY ADDRESS FILE TREASURER <br />