Laserfiche WebLink
EXISTING IMPERVIOUS AREA BEING CONVERTED TO PERVIOUS SURFACE AREA <br /> A TOTAL EXISTING IMPERVIOUS AREA <br /> B EXISTING IMPERVIOUS SURFACE AREA TO REMAIN <br /> EXISTING IMPERVIOUS AREA TO BE REPLACED <br /> D ADDED IMPERVIOUS SURFACE AREA <br /> E= B+C+D=TOTAL FINAL IMPERVIOUS SURFACE AREA <br /> F= E-A =NET NEW IMPERVIOUS SURFACE AREA <br /> Figure I. Project Areas Example <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 7 <br /> the Combined Sewer Area-September 2022 <br />