Laserfiche WebLink
DONE! <br /> You have now completed the Small Project Stormwater Report for the Combined <br /> System. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> Project Specific Stormwater Site Plan [This packet and drawings] <br /> Topographic Survey [if applicable] <br /> Eli Declaration of Covenant <br /> ❑ Construction TESC Drawings <br /> E Underground Injection Well(UIC)Registration*[if applicable] <br /> *You may need to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing U1C Construction. For more information,visit: <br /> everettwa.0v/9985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 19 <br /> the Combined Sewer Area-September 2022 <br />