Laserfiche WebLink
ROOF MOUNT PHOTOVOLTAIC SYSTEM <br /> CODES: CONSTRUCTION NOTES: <br /> THIS PROJECT COMPLIES WITH THE FOLLOWING: <br /> 2018 INTERNATIONAL BUILDING CODE CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND <br /> 2018 INTERNATIONAL RESIDENTIAL CODE ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. <br /> 2018 INTERNATIONAL FIRE CODE ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENT <br /> 2018 INTERNATIONAL ENERGY CONSERVATION CODE POSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY ARE <br /> 2018 INTERNATIONAL EXISTING BUILDING CODEMOUNTED. 9�,MAN1, <br /> 2018 INTERNATIONAL FUEL GAS CODE O <br /> MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION IN 0� WAs A� � <br /> 2018 INTERNATIONAL MECHANICAL CODE ACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PER ��¢•�� <br /> 2018 INTERNATIONAL PLUMBING CODE W <br /> 2020 NATIONAL ELECTRICAL CODE SECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD. <br /> � � y <br /> AS ADOPTED BY CITY OF EVERETT DIG ALERT (811)TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANY <br /> EXCAVATION TAKING PLACE002880 <br /> ,p <br /> PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM ��,t� ��GIsTFV- <br /> DC DISCONNECT/INVERTER AS PER 2020 NEC SEC 250.166(A). �`�SIONALE�� <br /> SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH <br /> VICINITY MAP: REQUIREMENTS OF ART. 690 OF THE 2020 NEC EXPIRES FEBRUARY 25,2026 <br /> THE MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR LIFER STAMPED 06/12/2024 <br /> UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM <br /> 9 CLIENT: <br /> RONALD WATSON <br /> INSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK. EMT CONDUIT 212048TH ST SE,EVERETT,WA 98203 <br /> AHJATTACHED TO THE ROOF USING CONDUIT MOUNT. UTILITY: <br /> CITY of EVERETT <br /> P <br /> UTILITY:SNOHOMISH PUD <br /> METER:76362395 <br /> AP N:005004-001-021-02 <br /> PHONE:(818)625-3242 <br /> I <br /> EMAIL:RONW91340@GMAIL.COM <br /> SYSTEM: <br /> SYSTEM SIZE(DC):11 X 410-4.510 kW <br /> SYSTEM SIZE(AC):3.190 kW @ 240V <br /> MODULES:11 X HANWHA CCELL:O.PEAK <br /> p DUO BLK ML-G10+410 <br /> MICROINVERTERS:11 X ENPHASE <br /> 108PLUS-72-2-US <br /> — 49t� t � <br /> SITE LOCATION <br /> TABLE OF CONTENTS: <br /> PV-1 PROJECT DETAILS <br /> REVISIONS <br /> PV-2 SITE PLAN NO. REVISED BY DATE <br /> PV-2A ROOF PLAN WITH MODULES LAYOUT <br /> PV-213 ARRAY DETAILS <br /> PV-3 MOUNTING DETAILS <br /> �-�rfreedom­ <br /> PV-3A MOUNTING DETAILS A F v E <br /> PV-4 THREE LINE DIAGRAM FREEDOM FOREVER LLC <br /> 43445 BUSINESS PARK DR#110,TEMECULA, <br /> PV-5 CONDUCTOR CALCULATIONS o <br /> Tel:(8800)00)33885-1075 <br /> PV-6 EQUIPMENT&SERVICE LIST GREG ALBRIGHT <br /> PV-7 LABELS <br /> �� A�A— <br /> PV-7A SITE PLACARD <br /> PV-8 MICROINVERTER CHART CONTRACTOR LICENSE: <br /> ELECTRICAL ADMINISTRATOR ALBRIG`807C1 <br /> PV-9 SAFETY PLAN <br /> PV-10 SAFETY PLAN <br /> APPENDIX MANUFACTURER SPECIFICATION SHEETS <br /> PROJECT DETAILS <br /> JOB NO: DATE: DESIGNED BY: SHEET: <br /> 449034 6/12/2024 Z.C. PV-1 <br />