My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7913 TIMBER CIR 2024-11-04
>
Address Records
>
TIMBER CIR
>
7913
>
7913 TIMBER CIR 2024-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 7:37:17 AM
Creation date
9/9/2024 3:30:20 PM
Metadata
Fields
Template:
Address Document
Street Name
TIMBER CIR
Street Number
7913
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rev I In - 1210 <br /> P 22c. . - 1 oco <br /> epW 14 o5 -633 <br /> CITY OF EVERETT <br /> EVERETT Community, Planning & Economic Development Department <br /> WASHINGTON Planning Division <br /> ACCESSORY DWELLING UNIT CHECKLIST <br /> INSTRUCTIONS -3 Submit this checklist with either your building permit application (Review <br /> Process I), or with your Accessory Dwelling Unit (Review Process II) application, in order to apply <br /> for an attached or detached ADU. The proposal must meet Everett Municipal Code 19.08.100, <br /> Accessory Dwelling Units and any other applicable zoning regulations. Note: This checklist only <br /> addresses zoning code regulations for ADUs and does not address building code or other site <br /> development codes. <br /> Column to be completed by <br /> Applicant 4, <br /> 1)0Fees. See current Fee Schedule for Review Process I or II. Total Fee: <br /> v <br /> This fee does not include building permit fees or system ��!'�' %Li <br /> development fees. Please speak with a Permit Technician at 425- <br /> 257-8810 opt 8 to understand all fees involved to add an ADU to <br /> your property. <br /> 2)DAlhere are ADUs Permitted? Zone of Property: 1 <br /> An ADU shall be permitted as an accessory use to the principal Historic Overlay: <br /> dwelling unit in the zones indicated in EMC 19.05, Use Table #5-1 on <br /> any legally established lot. <br /> 3)❑Is your application a Review Process I or II? Check one: <br /> Review Process 1. An ADU will be processed with your building Review Process I. Complete this <br /> permit application if no modification of the design standards is checklist and include it with your <br /> requested. building permit submittal. h-� <br /> Review Process 11. If requesting a modification from the design / <br /> standards listed below,the application shall be processed as a <br /> Review Process II. (See#13) <br /> Single family:more than one entrance on any street side <br /> %; • 2930 Wetmore Ave, Ste 8-A i l-'\I 425.257.8731 planning@everettwa.gov <br /> -- Everett,WA 98201 425.257.8742 fax , everettwa.gov <br /> Updated April 2021 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.