Laserfiche WebLink
Page 30 of 42 4/3/24 Agreement No. 2024-02 <br /> <br /> <br /> <br />SECTION C: CONSTRUCTION AND MAINTENANCE <br /> <br />C-40 Road Plan <br /> <br />Road construction and associated work contained in the Road Plan for this sale, dated <br />4/5/24 and attached as Exhibit C, are hereby made a part of this Contract and shall be <br />completed by Purchaser. <br /> <br />C-50 Purchaser Road Maintenance and Repair <br /> <br />Purchaser shall perform work on the gravel portions of C-1000, E-1000, E-1300, S-1000, S- <br />1600, T-1000, T-1200, T-1210, T-1230, T-1240, T-1300, T-1310, T-1320, T-1321, T-1330, <br />T-1340, or T-1350 roads to prevent damage to subgrade, to maintain proper drainage and to <br />keep the road surface smooth and crowned. All gravel roads used shall meet the original <br />construction or reconstruction specifications at Contract termination. All other gravel roads <br />used shall be left in the condition that exists at the time the plan of operations is completed. <br /> <br />C-80 Landing Locations and Clean-up <br /> <br />Landings shall be located and marked by the Purchaser and approved by the Contract <br />Administrator prior to construction. Upon completion of use, landing debris shall be piled as <br />designated by the Contract Administrator. <br /> <br /> <br /> <br />SECTION S: SITE PREPARATION AND PROTECTION <br /> <br />S-1 Emergency Response Plan <br /> <br />An Emergency Response Plan (ERP) shall be provided to the Contract Administrator <br />containing but not limited to, valid contact numbers and procedures for medical <br />emergencies, fire, hazardous spills, forest practice violations and any unauthorized or <br />unlawful activity on or in the vicinity of the sale area. The Contract Administrator and <br />the City shall be promptly notified whenever an incident occurs requiring an <br />emergency response. <br /> <br />The ERP must be presented for inspection at the prework meeting and kept readily <br />available to all personnel, including subcontractors, on site during active operations <br /> <br />S-5 Operations in Watershed