Laserfiche WebLink
Page 33 of 42 4/3/24 Agreement No. 2024-02 <br />12. In the event of repair or routine maintenance such as oil changes or adjustment of <br />hydraulic gear, equipment shall be moved to a designated storage and maintenance <br />location agreed to by City’s Contract Administrator. <br /> <br />13. Particular attention shall be given to housekeeping practices in the watershed. The <br />area shall be kept free of trash, oily rags, empty containers etc. All extraneous or <br />partially full containers of petroleum products or other chemicals shall be removed <br />from the watershed at the end of each day. <br /> <br />14. Sanitary facilities provided by the City and rubbish containers provided by the <br />Purchaser shall be located at all work sites and all locations where workers gather <br />prior to start of work or shift changes. Sanitary facilities shall be maintained by the <br />City in a clean and sanitary condition and shall be serviced regularly to prevent <br />spillage or undue odors. All personnel shall be required to exclusively use the sanitary <br />facilities. Notice shall be given that offenders will be dismissed and shall not be <br />rehired for work on this Contract. Rubbish containers will have watertight lids, will <br />be lined with plastic and will not be permitted to overflow. Whenever possible, <br />sanitary facilities and rubbish containers shall be located, so that should a spill occur, <br />it will drain away from the Reservoir. <br /> <br />15. Stockpiles of construction materials such as explosives and other potential pollutants <br />shall be stored and protected from the effects of wea6ther and surface runoff. <br /> <br />B. Earthwork. <br /> <br />1. The Purchaser shall exercise judgment and skill in carrying out all earthwork-related <br />activities due to the turbidity threat they pose to water quality. All work shall be within <br />accepted standards of good practice for environmentally sensitive locations and as <br />specified. <br /> <br />2. Constructed slopes whether temporary or permanent shall be constructed as shown on <br />the Road Plan and/or as dictated by safe practice. <br /> <br />3. The Purchaser shall conduct work activities under the premise than an intense <br />precipitation event can occur at any time and preventive measures should be taken to <br />protect against erosion. Temporary erosion control shall be installed prior to start of <br />earthwork activities. <br /> <br />4. Drainage shall be arranged to avoid concentration of runoff. Preference shall be given <br />to longer, less direct drainage paths to existing waterways utilizing overland flow <br />through undisturbed areas. <br /> <br />C. Emergency Response. <br /> <br />1. Any condition causing or threatening to cause chemicals, petroleum products or large <br />amount of turbid water to enter the Reservoir or natural streams, or an accident such <br />as a vehicle entering the Reservoir will be considered an emergency condition and <br />actions to stop or remove the violating conditions shall be taken immediately.