Laserfiche WebLink
Page 35 of 42 4/3/24 Agreement No. 2024-02 <br />During the "closed season", as determined by Washington State Department of Natural <br />Resources, when the humidity is thirty percent (30%) or lower on the sale area, all operations <br />must cease. <br /> <br />S-60 Pump Truck or Pump Trailer <br /> <br />Purchaser shall provide a fully functional pump truck and/or pump trailer equipped to meet <br />the specifications of WAC 332-24-005 and WAC 332-24-405 during the "closed season" or <br />as extended by the City and shall provide trained personnel to operate this equipment on the <br />sale area during all operating periods. <br /> <br />S-80 Watchman <br /> <br />During the "closed season" or as extended by the City, on days when the class of day is 3L <br />or above, Purchaser shall provide a watchman for an additional one hour more than required <br />by WAC 332-24-005 and WAC 332-24-405. Watchman shall be capable of operating fire <br />equipment and taking effective action upon any fire on the operation. <br /> <br />S-130 Hazardous Materials <br /> <br />a. Hazardous Materials and Waste - Regulatory Compliance <br /> <br />Purchaser is responsible for understanding and complying with all applicable <br />local, state, and federal hazardous material/waste laws and regulations for <br />operations conducted under this Contract. Such regulations pertain to, but <br />may not be limited to, hazardous material storage, handling and transport, <br />personnel protection, release notification and emergency response, cleanup <br />and waste disposal. Purchaser shall be responsible for restoring the site in the <br />event of a spill. <br /> <br />b. Hazardous Materials Spill Prevention <br /> <br />All operations shall be conducted in a manner that avoids the release of <br />hazardous materials, including petroleum products, into the environment <br />(water, air or land). <br /> <br />c. Hazardous Materials Spill Containment, Control and Cleanup <br /> <br />If safe to do so, Purchaser shall take immediate action to contain and control <br />all hazardous material spills. Purchaser shall ensure that enough quick <br />response spill kits capable of absorbing 4 to 6 gallons of oil, coolant, solvent <br />or contaminated water are available on site to quickly address potential spills <br />from any piece of equipment at all times throughout active operations. If <br />large quantities of bulk fuel/other hazardous materials are stored on site, <br />Purchaser must be able to effectively control a container leak and contain & <br />recover a hazmat spill equal to the largest single on site storage container <br />volume.