My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/09/11 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/09/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 9:56:21 AM
Creation date
9/12/2024 9:51:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Professional Services Agreement (PSA) for construction of Lift Station 47 – Beverly Lake Sewer <br />Replacement project with Casne Engineering. <br />Council Bill # interoffice use <br /> <br />Project: Beverly Lake Sewer Replacement Project Partner/Supplier: Casne Engineering (Electrical) <br /> Location: Beverly Lake from 645-801 75th Street SE <br />Preceding action: Ordinance No. 3737-20, approved 3/18/20 <br />Fund: 336 – Water & Sewer System Improvements <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 09/11/24 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed agreement <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />Thood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The programmed available funding, as established by City Ordinance No. 3737-20, is <br />$3,500,000. <br /> <br />Project summary statement: <br />This improvement project will include furnishing all labor, materials and equipment <br />necessary to realign and replace pipes and structures to bring sewage to a proposed <br />centralized lift station. Construction will include 480 linear feet of water service and <br />approximately 700 linear feet of sanitary sewer main, 560 linear feet of sewer force <br />main, 6-48” Sewer Manholes, Lift Station Below and Above-Grade, , 415 ton of HMA, <br />950 feet of electrical conduit, 1 each Electrical Junction Box and other such <br />appurtenances. <br />The proposed project will incorporate trenchless technology to minimize the <br />environmental impacts as well as impacts to local residents. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Professional Services Agreement with Casne Engineering for the <br />construction of Lift Station 47 – Beverly Lake Sewer Replacement Project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.