My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 9/5/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
IMCO General Construction 9/5/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:27 AM
Creation date
9/13/2024 11:15:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
9/5/2024
Council Approval Date
9/4/2024
End Date
2/22/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003541
Total Compensation
$3,477,249.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 12/13/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
All material herein © 2003-2023 Randall-Reilly All rights reserved.Page 1 of 1 <br />June 12, 2023 <br />137 gal/minPump Capacity 500 galTank Capacity <br />www.equipmentwatch.com <br />All prices shown in US dollars ($) <br />Adjustments for TR2297 in Active 2022 <br />Magnum MWT-500 <br />Water Trailers <br />Size Class: <br />To 4,500 gal <br />Weight: <br />N/A <br />Configuration for MWT-500 <br />Blue Book Rates <br />** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. <br />Ownership Costs Estimated Operating <br />Costs <br />FHWA Rate** <br />Monthly Weekly Daily Hourly Hourly Hourly <br />Published Rates USD $345.00 USD $97.00 USD $24.00 USD $4.00 USD $1.87 USD $3.83 <br />Adjustments <br />Region ( Washington: <br />105.3%) <br />USD $18.28 USD $5.14 USD $1.27 USD $0.21 <br />Model Year (2014: 96.53%)(USD $12.60)(USD $3.54)(USD $0.88)(USD $0.15) <br />Adjusted Hourly Ownership <br />Cost (100%) <br />---- <br />Hourly Operating Cost (100%)- <br />Total:USD $350.68 USD $98.60 USD $24.40 USD $4.07 USD $1.87 USD $3.86 <br />Non-Active Use Rates Hourly <br />Standby Rate USD $1.51 <br />Idling Rate USD $1.99 <br />Rate Element Allocation <br />Element Percentage Value <br />Depreciation (ownership)40%USD $138.00/mo <br />Overhaul (ownership)24%USD $82.80/mo <br />CFC (ownership)17%USD $58.65/mo <br />Indirect (ownership)19%USD $65.55/mo <br />Fuel cost data is not available for these rates. <br />Revised Date: 2nd quarter 2023 <br />These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Blue <br />Book Print. Visit the Cost Recovery Product Guide on our Help page for more information. <br />The equipment represented in this report has been exclusively prepared for CHRIS PEACH <br />(cpeach@imcoconstruction.com)www.equipmentwatch.com
The URL can be used to link to this page
Your browser does not support the video tag.