Laserfiche WebLink
20.00 <br />NA <br />HOURS RATE HOURS RATE <br />-20.0 83.009 -1660.18 <br />0.00 <br />0.00 <br />-1660.18 <br />-1660.18 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />IN USE AMOUNT <br />-20.0 Hrs -1567.00 <br />-20.0 Hrs -528.60 <br />0.00 <br />-2095.60 <br />0.00 <br />-2095.60 <br />AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />-3755.78TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />DESCRIPTION <br />2014 60,001 lb and over truck HT 0429 - Semi Truck <br />2017 60 ton lowboy TR 2289 - Lowboy Trailer <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />TOTAL LABOR $ <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />UNIT QTY PRICEDESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />Trk & Trlr <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:Portal 4 Improvements <br />Wednesday, July 17, 2024 <br />TRADE/CLASSIFICATION AMOUNT <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />Credit for 4 mobilizations (1 ea. Crane to site, 1 ea. Large excavator to site… demobilize both = 4 loads) <br />Assume 2 hours each way and one hour to offload / load = 5 hours / load X 4 loads = 20 hours. <br />Description of Work: <br />CONTRACTOR PERFORMING WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />78.35 <br />26.43