Laserfiche WebLink
Portal 4 Improvements - IMCO General Construction - Additional Caulking <br />13.00 <br />NA <br />HOURS RATE HOURS RATE <br />26.0 91.870 2388.62 <br />27.0 81.985 2213.60 <br />35.5 63.161 2242.22 <br />3.0 81.985 245.96 <br />3.0 91.870 275.61 <br />6844.43 <br />1984.88 <br />8829.32 <br />EA 1.0 339.96 <br />339.96 <br />71.39 <br />411.35 <br />IN USE AMOUNT <br />36.0 EST 6003.72 <br />36.0 EST 1215.00 <br />3.0 EST 92.19 <br />7310.91 <br />0.00 <br />1535.29 <br />8846.20 <br />AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />18086.87TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />NAME DESCRIPTION <br />Subcontractor <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />DESCRIPTION <br />FL0533 2013 Genie 8000# Reach Lift Truck <br />LT0267 2012 Ford F350 Crew Cab 4 Light Duty Truck <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />ST0295 2022 Ford F450 Light Duty Truck <br />TOTAL LABOR $ <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Carpenter <br />Laborer <br />Carpenter <br />Foreman <br />TOTAL MATERIALS $ <br />UNIT QTY PRICE <br />339.96 <br />DESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />Sikaflex EZ Mix Whitecap <br />Jeremiah Sterling <br />Operator Foreman <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#: <br />Portal 4 Improvements <br />Tuesday, February 28, 2023 <br />TRADE/CLASSIFICATION AMOUNT <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />Additional CaulkingDescription of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />166.77 <br />33.75 <br />30.73 <br />Corey Davis <br />Sam King <br />Grayson Luttrell <br />Justin Peter