My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 9/5/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
IMCO General Construction 9/5/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:27 AM
Creation date
9/13/2024 11:15:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
9/5/2024
Council Approval Date
9/4/2024
End Date
2/22/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003541
Total Compensation
$3,477,249.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 12/13/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Portal 4 Improvements - IMCO General Construction - Stop Logs <br />13.00 <br />NA <br />HOURS RATE HOURS RATE <br />130.0 81.985 10658.05 <br />129.5 81.985 10617.06 <br />8.0 91.870 734.96 <br />127.0 91.870 11667.49 <br />33677.56 <br />9766.49 <br />43444.05 <br />LS 1.0 175565.19 <br />175565.19 <br />36868.69 <br />212433.88 <br />IN USE AMOUNT <br />32.0 EST 2022.40 <br />127.0 EST 4286.25 <br />8.0 EST 270.00 <br />126.0 EST 21013.02 <br />116.0 EST 1494.08 <br />29085.75 <br />0.00 <br />6108.01 <br />35193.76 <br />AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />291071.69TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Carpenter <br />Foreman <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />TiltDeck Utility Trailer <br />DESCRIPTION <br />EX0460 2019 1221 Yanmar VIO50-6 Excavator <br />ST0295 2022 Ford F450 Light Duty Truck <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />Corey Davis Foreman <br />175565.19See the attached Materials Spreadsheet <br />FL0533 2013 Genie 8000# Reach Lift Truck <br />TR2302 2019 Load Trail 83x14 Low P <br />TOTAL EQUIPMENT RENTAL TAX $ <br />ST0296 2022 Ford F450 Light Duty Truck 33.75 <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:Portal 4 Improvements <br />Tuesday, February 28, 2023 <br />Put in Portal 4 stop logsDescription of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />Sam King <br />Justin Peter <br />Jeremiah Sterling <br />Carpenter <br />NAME TRADE/CLASSIFICATION AMOUNT <br />UNIT QTY PRICEDESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />LABOR <br />TOTAL LABOR $ <br />MISC <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />12.88 <br />63.20 <br />33.75 <br />166.77 <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher
The URL can be used to link to this page
Your browser does not support the video tag.