My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 9/5/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
IMCO General Construction 9/5/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:27 AM
Creation date
9/13/2024 11:15:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
9/5/2024
Council Approval Date
9/4/2024
End Date
2/22/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003541
Total Compensation
$3,477,249.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 12/13/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WFP Emergency Generator - IMCO General Construction - Portal 6 Inspection <br />13.00 <br />NA <br />HOURS RATE HOURS RATE <br />12.0 80.410 964.92 <br />18.0 71.530 1287.54 <br />21.0 54.620 1147.02 <br />0.00 <br />3399.48 <br />985.85 <br />4385.33 <br />LS 1.0 5053.98 <br />0.00 <br />5053.98 <br />1061.34 <br />6115.32 <br />IN USE AMOUNT <br />4.0 EST 135.00 <br />0.00 <br />135.00 <br />0.00 <br />28.35 <br />163.35 <br />AMOUNT <br />14084.73 <br />0.00 <br />14084.73 <br />1690.17 <br />15774.90 <br />26438.89TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />LS <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />Quality Coatings Inspection and Consultiing Inspection 1.00 14084.73 <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />DESCRIPTION <br />LT0267 2012 Ford F350 Crew Cab 4 Light Duty Truck <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />TOTAL LABOR $ <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Carpenter <br />Laborer <br />UNIT QTY PRICE <br />3784.94 <br />DESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />See the attached Material Spreadsheet Misc <br />Grayson Luttrell <br />Operator Foreman <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#: <br />WFP Emergency Generator <br />Tuesday, February 28, 2023 <br />TRADE/CLASSIFICATION AMOUNT <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />Inspection of the Portal 6 standpipe interior coatings and New ScreenDescription of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />33.75 <br />Corey Davis <br />Sam King
The URL can be used to link to this page
Your browser does not support the video tag.