CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />113 <br />1 Cable Racking in Pull Boxes and Cable Vaults <br />2 The Contractor shall rack the cable in vertical figure eight loops, which shall permit <br />3 pulling slack from the vaults without introducing twist to the cable. <br />4 <br />5 Cables shall be secured in racked positions with nylon ties. Identification or warning <br />6 tags shall be securely attached to the cables in at least two locations in each pull box <br />7 or cable vault. <br />8 <br />9 All coiled cable shall be protected to prevent damage to the cable and fibers. Racking <br />10 shall include securing cables to brackets (racking hardware) that extend from the side <br />11 walls of the pull box. <br />12 <br />13 All racking hardware shall be stainless steel. <br />14 <br />15 <br />16 <br />17 CNH 8-20.3(10) SERVICE.RTF <br />18 8-20.3(10) Service, Transformer, and Intelligent Transportation System <br />19 (ITS) Cabinets <br />20 <br />21 Section 8-20.3(10) is supplemented with the following: <br />22 <br />23 A) Risers on PUD Poles or City owned poles: If the PUD does not install <br />24 a pedestal at the base of the service pole, the Contractor shall be <br />25 responsible to install conduit risers on PUD or City owned poles as <br />26 necessary for electrical service connections. Conduit risers shall be <br />27 constructed in accordance with Everett Standard Plan No. 820. The <br />28 bottom 10 of the riser shall be galvanized steel or Schedule 80 PVC <br />29 and the remaining portion shall be Schedule 40 PVC or Schedule 80 <br />30 PVC. The riser shall be installed on a standoff with 4 minimum <br />31 clearance between the conduit and the pole. A weather head is <br />32 required and shall be located 8 below the secondary power lines. In <br />33 general, the Contractor will be responsible for trenching to within 6 of <br />34 the PUD installed pedestal at the base of the service pole. <br />35 <br />36 B) Service Connections: The Contractor shall obtain a City of Everett <br />37 Electrical Permit from the Contracting Agency at no cost. Coordinate <br />38 with the Engineer a minimum of 30 days prior to connection for all <br />39 Electrical Permits. When the service is ready to be hooked up, the <br />40 Contractor shall contact the Engineer to request an electrical <br />41 inspection. After the service has been approved for hook up, the City <br />42 shall contact the Snohomish County PUD and they will make the <br />43 service connections to the power supply at a cost to be paid by the <br />44 City. The Contractor shall notify the PUD of the work schedule as soon <br />45 as possible so their work can be coordinated with the Contractors <br />46 work. <br />47 <br />48 CNH 8-20.3(11) TESTING APS ONLY.RTF <br />49 8-20.3(11) Testing <br />50 Section 8-20.3(11) is supplemented with the following: