My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />124 <br />1 20) ASTM D5261 Test Method for Measuring Mass per Unit Area of Geotextiles <br />2 21) ASTM D5262 Standard Test Method for Evaluating the Unconfined Tension <br />3 Creep and Creep Rupture Behavior of Geosynthetics <br />4 22) ASTM D5493 Standard Test Method for Permittivity of Geotextiles Under Load <br />5 23) ASTM D5818 Standard Practice for Exposure and Retrieval of Samples to <br />6 Evaluate Installation Damage of Geosynthetics <br />7 24) ASTM D6241 Standard Test Method for Static Puncture Strength of Geotextiles <br />8 25) ASTM D6574 Standard Test Method for Determining the (In-Plane) Hydraulic <br />9 Transmissivity of a Geosynthetic by Radial Flow <br />10 26) ASTM D6637 Standard Test Method for Determining Tensile Properties of <br />11 Geogrids by the Single or Multi-Rib Tensile Method <br />12 27) ASTM D6638 Standard Test Method for Determining Connection Strength <br />13 Between Geosynthetic Reinforcement and Segmental Concrete Units (Modular <br />14 Concrete Blocks) <br />15 28) ASTM D6706 Standard Test Method for Measuring Geosynthetic Pullout <br />16 Resistance in Soil <br />17 29) ASTM D6916 Standard Test Method for Determining the Shear Strength <br />18 Between Segmental Concrete Units (Modular Concrete Blocks) <br />19 30) ASTM D8102 Standard Practice for Manufacturing Quality Control of <br />20 Geotextiles <br />21 <br />22 American Association of State Highway and Transportation Officials (AASHTO) <br />23 1) AASHTO M252 Corrugated Polyethylene Drainage Pipe <br />24 2) AASHTO M288 Standard Specification for Geotextile Specification for Highway <br />25 Applications <br />26 <br />27 8-26.1(2)Quality Assurance Submittals <br />28 Contractor shall submit a list of five (5) previously constructed projects of similar size <br />29 and magnitude by the wall installer where the specific retaining wall system has been <br />30 constructed successfully. Contact names and telephone numbers shall be listed for <br />31 each project. <br />32 <br />33 Contractor shall submit a Manufacturer’s certification, prior to start of work, that the <br />34 retaining wall system components meet the requirements of this specification and the <br />35 structure design. <br />36 <br />37 Contractor shall submit certificate of compliance for each lot of bond breaker material <br />38 delivered. <br />39 <br />40 Contractor shall submit a sample of each different unit for approval. <br />41 <br />42 Contractor shall provide soil testing and quality assurance inspection during <br />43 earthwork and wall construction operations. Contractor shall provide quality control <br />44 testing and inspection during construction. Owner’s quality assurance program does <br />45 not relieve the contractor of responsibility for quality control and wall performance. <br />46 <br />47 8-26.1(3)Delivery, Storage and Handling <br />48 Contractor shall check all materials upon delivery to assure that the proper type, <br />49 grade, color, and certification have been received. <br />50
The URL can be used to link to this page
Your browser does not support the video tag.