My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />128 <br />1 Over excavation and replacement of unsuitable foundation soils and replacement with <br />2 approved compacted fill will be compensated as agreed upon with the Engineer. <br />3 <br />4 8-26.3(1) Base Leveling Pad Installation <br />5 <br />6 Base leveling pad material shall be placed to the lines and grades shown on the <br />7 construction drawings, to a minimum thickness of 6" (150 mm) and extend laterally a <br />8 minimum of 6" (150 mm) in front and behind the CMB unit. <br />9 <br />10 Soil leveling pad materials shall be compacted to a minimum of 95% Standard Proctor <br />11 density per ASTM D698 or 92% Modified Proctor Density per ASTM D1557. <br />12 <br />13 Base leveling pad shall be prepared to insure full contact to the base surface of the <br />14 concrete units. <br />15 <br />16 8-26.3(2) CMB Unit Installation <br />17 CMB concrete units shall conform to the following construction requirements: <br />18 1) Vertical setback: 1" (25 mm) per course per the design; <br />19 2) Alignment and grid positioning mechanism fiberglass pins, two per unit <br />20 minimum. <br />21 3) Maximum horizontal gap between erected units shall be h 1/2" (13 mm). <br />22 <br />23 First course of CMB units shall be placed on the leveling pad at the appropriate line <br />24 and grade. Alignment and level shall be checked in all directions, ensuring that all units <br />25 are in full contact with the base and properly seated. <br />26 <br />27 Place the front of CMB units side-by-side. Do not leave gaps between adjacent CMB <br />28 units. Layout of corners and curves shall be in accordance with manufacturer’s <br />29 recommendations. <br />30 <br />31 Maximum stacked vertical height of wall units, prior to unit drainage fill and backfill <br />32 placement and compaction, shall not exceed two courses. <br />33 <br />34 8-26.3(3) Shear Connector Installation <br />35 Install shear/connecting devices per manufacturers recommendations. <br />36 <br />37 8-26.3(4) Unit Drainage Fill Installation <br />38 Place unit drainage fill within CMB units. Unit drainage fill shall be placed within the <br />39 cores of, between, and behind the units as indicated on the design drawings. Not less <br />40 than one cubic foot (0.028 m3), of unit drainage fill shall be used for each square foot <br />41 (0.093 m2) of wall face unless otherwise specified. <br />42 <br />43 8-26.3(5) Geogrid Soil Reinforcement Installation <br />44 Geogrid shall be oriented with the highest strength axis perpendicular to the wall <br />45 alignment. <br />46 <br />47 Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown <br />48 on the construction design drawings or as directed by the Engineer. <br />49
The URL can be used to link to this page
Your browser does not support the video tag.