My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br />CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 10, 2024 <br />E <br />Category 2: Sensitive information <br />1 Materials-----------------------------------------------------------------------------------------------99 <br />2 Equipment List And Drawings--------------------------------------------------------------------99 <br />3 Conduit, Innerduct, and Outerduct ------------------------------------------------------------100 <br />4 Rigid Metal Conduit Fittings and Appurtenances------------------------------------------101 <br />5 Non-Metallic Conduit------------------------------------------------------------------------------101 <br />6 9-29.2Junction Boxes, Cable Vaults, and Pull Boxes---------------------------------------101 <br />7 Cover Markings-------------------------------------------------------------------------------------102 <br />8 Traffic Signal Standards -------------------------------------------------------------------------102 <br />9 Traffic Signal Controller --------------------------------------------------------------------------106 <br />10 Flashing Beacon Control-------------------------------------------------------------------------106 <br />11 Pedestrian Push Buttons ------------------------------------------------------------------------107 <br />12 Pedestrian Signals---------------------------------------------------------------------------------108 <br />13 8-20 (9-29.21) FLASHING BEACONS---------------------------------------------------------108 <br />14 Construction Requirements ---------------------------------------------------------------------109 <br />15 8-20.3(1)General -------------------------------------------------------------------------------------109 <br />16 Removing and Replacing Improvements ----------------------------------------------------110 <br />17 8-20.3(6)Junction Boxes, Cable Vaults, and Pull boxes -----------------------------------111 <br />18 8-20.3(10)Service, Transformer, and Intelligent Transportation System---------------113 <br />19 8-20.3(11)Testing ------------------------------------------------------------------------------------113 <br />20 8-20.3(13)Illumination Systems -------------------------------------------------------------------113 <br />21 8-20.3(17)AsBuilt Plans-----------------------------------------------------------------------------116 <br />22 8-20.3(18) Potholing--------------------------------------------------------------------------------116 <br />23 Measurement ---------------------------------------------------------------------------------------117 <br />24 Payment----------------------------------------------------------------------------------------------118 <br />25 8-21PERMANENT SIGNING----------------------------------------------------------------------118 <br />26 8-22PAVEMENT MARKING-----------------------------------------------------------------------119 <br />27 SECTION 8-23 TEMPORARY PAVEMENT MARKINGS----------------------------------122 <br />28 8-32 RESOLVED UNANTICIPATED CONFLICTS -----------------------------------------131 <br />29 8-32.3(1) Aboveground Conflicts-----------------------------------------------------------------131 <br />30 8-32.3(2) Underground Conflicts -----------------------------------------------------------------132 <br />31 8-33 PRIVATE IMPROVEMENT RESTORATION------------------------------------------132 <br />32 8-32 ELECTRONIC FILES------------------------------------------------------------------------133 <br />33 APPENDICES-----------------------------------------------------------------------------------------134
The URL can be used to link to this page
Your browser does not support the video tag.