Laserfiche WebLink
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />41 <br />1 1-08.1.GR1 <br />2 Subcontracting <br />3 <br />4 1-08.1.INST1.GR1 <br />5 Section 1-08.1 is supplemented with the following: <br />6 <br />7 1-08.1(9)B.OPT1.2025.GR1 <br />8 (January 24, 2024) <br />9 16. 1-07.11 Requirements for Nondiscrimination Item 11 from Section 1- <br />10 07.11(2). <br />11 <br />12 1-08.3.GR1 <br />13 Progress Schedule <br />14 <br />15 1-08.3(2).NEW.GR1 <br />16 General Requirements <br />17 <br />18 COE 1-08.3(2)A.RTF <br />19 1-08.3(2)A Type A Progress Schedule <br />20 (December 30, 2022 APWA GSP) <br />21 <br />22 Revise this section to read: <br />23 <br />24 The Contractor shall submit 3 copies of a Type A Progress Schedule no later than at the <br />25 preconstruction conference, or some other mutually agreed upon submittal time. The <br />26 schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br />27 schedule format. Regardless of which format used, the schedule shall identify the critical <br />28 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br />29 schedule for corrections within 15 calendar days of receiving the submittal. <br />30 <br />31 <br />32 1-08.5.OptionA.RTF <br />33 1-08.5 Time for Completion <br />34 (December 30, 2022 APWA GSP, Option A) <br />35 <br />36 <br />37 Revise the third and fourth paragraphs to read: <br />38 <br />39 Contract time shall begin on the first working day following the Notice to Proceed Date. <br />40 <br />41 Each working day shall be charged to the contract as it occurs, until the contract work is <br />42 physically complete. If substantial completion has been granted and all the authorized <br />43 working days have been used, charging of working days will cease. Each week the <br />44 Engineer will provide the Contractor a statement that shows the number of working days: <br />45 (1) charged to the contract the week before; (2) specified for the physical completion of <br />46 the contract; and (3) remaining for the physical completion of the contract. The statement <br />47 will also show the nonworking days and all partial or whole days the Engineer declares as <br />48 unworkable The statement will be identified as a Written Determination by the Engineer. If <br />49 the Contractor does not agree with the Written Determination of working days, the <br />50 Contractor shall pursue the protest procedures in accordance with Section 1-04.5. By <br />51 failing to follow the procedures of Section 1-04.5, the Contractor shall be deemed as <br />52 having accepted the statement as correct. If the Contractor is approved to