CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />45 <br />1 The initial progress estimate will be made not later than 30 days after the Contractor <br />2 commences the work, and successive progress estimates will be made every month <br />3 thereafter until the Completion Date. Progress estimates made during progress of the <br />4 work are tentative, and made only for the purpose of determining progress payments. The <br />5 progress estimates are subject to change at any time prior to the calculation of the final <br />6 payment. <br />7 <br />8 The value of the progress estimate will be the sum of the following: <br />9 1. Unit Price Items in the Bid Form the approximate quantity of acceptable units of <br />10 work completed multiplied by the unit price. <br />11 2. Lump Sum Items in the Bid Form based on the approved Contractors lump sum <br />12 breakdown for that item, or absent such a breakdown, based on the Engineers <br />13 determination. <br />14 3. Materials on Hand 100 percent of invoiced cost of material delivered to Job site <br />15 or other storage area approved by the Engineer. <br />16 4. Change Orders entitlement for approved extra cost or completed extra work as <br />17 determined by the Engineer. <br />18 <br />19 Progress payments will be made in accordance with the progress estimate less: <br />20 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br />21 2. The amount of progress payments previously made; and <br />22 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br />23 Contract Documents. <br />24 <br />25 Progress payments for work performed shall not be evidence of acceptable performance <br />26 or an admission by the Contracting Agency that any work has been satisfactorily <br />27 completed. The determination of payments under the contract will be final in accordance <br />28 with Section 1-05.1. <br />29 <br />30 Failure to perform obligations under the Contract by the Contractor may be decreed by the <br />31 Contracting Agency to be adequate reason for withholding any payments until compliance <br />32 is achieved. <br />33 <br />34 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br />35 the Contractor under the Contract will be paid based upon the final estimate made by the <br />36 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br />37 Contractor. The Contractor’s signature on such voucher shall be deemed a release of all <br />38 claims of the Contractor unless a Certified Claim is filed in accordance with the <br />39 requirements of Section 1-09.11 and is expressly excepted from the Contractors <br />40 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br />41 signs the Final Contract Voucher Certification constitutes the final acceptance date (Section <br />42 1-05.12). <br />43 <br />44 If the Contractor fails, refuses, or is unable to sign and return the Final Contract Voucher <br />45 Certification or any other documentation required for completion and final acceptance of <br />46 the Contract, the Contracting Agency reserves the right to establish a Completion Date (for <br />47 the purpose of meeting the requirements of RCW 60.28) and unilaterally accept the <br />48 Contract. Unilateral final acceptance will occur only after the Contractor has been provided <br />49 the opportunity, by written request from the Engineer, to voluntarily submit such