Diverse Earthworks, Inc 9/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Diverse Earthworks, Inc 9/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 1:32:48 PM
Creation date
9/16/2024 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Diverse Earthworks, Inc
Approval Date
9/16/2024
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
WEST MARINE VIEW DRIVE/ALVERSON AND 41ST ST/GRAND AVE PEDESTRIAN IMPROVEMENTS
Public Works WO Number
3630
Tracking Number
0004512
Total Compensation
$519,436.93
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Diverse Earthworks, Inc 4/24/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT WEST MARINE VIEW DRIVE/ALVERSON AND 41 ST ST/GRAND AVE <br />PEDESTRIAN IMPROVEMENTS <br />STATE FUND# HLP-PB15(032) <br />WO #3630 July 25, 2024 <br />62 <br />1 <br />2 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br />3 A Material Transfer Device/Vehicle (MTD/V) shall only be used with the Engineers <br />4 approval, unless otherwise required by the contract. <br />5 <br />6 Where an MTD/V is required by the contract, the Engineer may approve paving without <br />7 an MTD/V, at the request of the Contractor. The Engineer will determine if an equitable <br />8 adjustment in cost or time is due. <br />9 <br />10 When used, the MTD/V shall mix the HMA after delivery by the hauling equipment and <br />11 prior to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a <br />12 uniform temperature throughout the mixture. If a windrow elevator is used, the length of <br />13 the windrow may be limited in urban areas or through intersections, at the discretion of <br />14 the Engineer. <br />15 <br />16 To be approved for use, an MTV: <br />17 <br />18 1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver. <br />19 2. Shall not be connected to the hauling vehicle or paver. <br />20 3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. <br />21 4. Shall mix the HMA after delivery by the hauling equipment and prior to <br />22 placement into the paving machine. <br />23 5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the <br />24 mixture. <br />25 <br />26 To be approved for use, an MTD: <br />27 <br />28 1. Shall be positively connected to the paver. <br />29 2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. <br />30 3. Shall mix the HMA after delivery by the hauling equipment and prior to <br />31 placement into the paving machine. <br />32 4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the <br />33 mixture. <br />34 <br />35 5-04.3(3)E Rollers <br />36 Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good <br />37 condition and capable of reversing without backlash. Operation of the roller shall be in <br />38 accordance with the manufacturers recommendations. When ordered by the Engineer for <br />39 any roller planned for use on the project, the Contractor shall provide a copy of the <br />40 manufacturers recommendation for the use of that roller for compaction of HMA. The <br />41 number and weight of rollers shall be sufficient to compact the mixture in compliance with <br />42 the requirements of Section 5-04.3(10). The use of equipment that results in crushing of <br />43 the aggregate will not be permitted. Rollers producing pickup, washboard, uneven <br />44 compaction of the surface, displacement of the mixture or other undesirable results shall <br />45 not be used. <br />46