Laserfiche WebLink
LANNIOX Project Submittal <br /> UNIT CLEARANCES <br /> C <br /> B <br /> D <br /> l <br /> A <br /> A B C D To <br /> ' <br /> Unit Clearance Clearance <br /> In. mm in. mm in. mm in. mm <br /> Service Clearance 48 1219 36 914 36 914 36 914 <br /> Clearance to Combustibles 36 914 1 25 1 25 1 25 Unobstructed <br /> Minimum Operation Clearance 36 914 36 914 36 914 36 914 <br /> NOTE-Entire perimeter of unit base requires support when elevated above the mounting surface <br /> Service Clearance-Required for removal of serviceable parts <br /> Clearance to Combustibles-Required clearance to combustible material <br /> Minimum OWadon Clearance-Required clearance for proper unit operation. <br /> Project Name:210 Everett Mall Way,Everett,WA 98208 Page <br /> Quote:449659 7 of 19 <br />