Laserfiche WebLink
GENERAL ELECTRICALIDEMO NOTES <br /> KEY NOTES-ELECTRICAL DEMOLITION: <br /> 1 EXISTING LIGHTING AND ASSOCIATED BRANCH CIRCUIT WIRING AND RACEWAYS TO BE REMOVED. <br /> 2 DEMO PHASE:REMOVE EXISTING ELECTRICAL PANEL,JUNCTION/PULL BOXES,AND CONTROL <br /> 1 DEMO:REMOVE EXISTING FEEDER AND BRANCH CIRCUIT WIRING FROM CONDUITS MOUNTED TO THE CABINETS TO ACCOMMODATE DEMOLITION OF THE BRIDGE NORTH TOWER STRUCTURE AND <br /> EXISTING BRIDGE STRUCTURE.OPTION:PROTECT CONDUCTORS FOR RE-INSTALLATION IN NEW BRIDGE FOUNDATION.PROTECT EXISTING UNDERGROUND CONDUITS TO EXTENTS PRACTICAL.REMOVE <br /> CONDUIT RUN MOUNTED TO NEW BRIDGE STRUCTURE. EXISTING WIRING TO THE DESTINATION END OF THE UNDERGORUND CONDUIT ENDS-THE LEAD <br /> LIGHTING POLE BASE FOR EACH CONDUIT. <br /> REMOVE EXISTING(2)2"GRC FEEDER AND BRANCH CIRCUIT CONDUITS FROM EXISTING BRIDGE 3 DEMO PHASE:DISCONNECT EXISTING FEEDERS FROM UNDERGROUND CONDUITS ROUTED FROM <br /> STRUCTURE,AND PRESERVE ON SITE FOR RE-INSTALLATION,MOUNTING TO NEW PEDESTRIAN BRIDGE LISPS BUILDING ELECTRICAL DISTRIBUTION SYSTEM.CONDUITS AND ASSOCIATED BOXES AND <br /> STRUCTURE. FEEDER CONDUCTORS TO BE REMOVED IN CONJUNCTION WITH THE DEMOLITION OF THE EXISTING <br /> WALKWAY BRIDGE STRUCTURE. <br /> 2 REMOVE AND PRESERVE EXISTING PULL BOXES FOR FEEDER AND BRANCH CIRCUITS. 4 DEMO PHASE:REMOVE EXISTING SECURITY CAMERA AND TURN OVER TO USPS FOR TEMPORARY <br /> STORAGE OR MOUNTING.REMOVE EXISTING CABLING AND CONDUIT FROM BRIDGE STRUCTURE. <br /> 3 PULL OUT APPROX.40 LIN.FT.OF FEEDER CONDUCTURES FROM SOUTH STAIR PULL BOX,AND COIL AND <br /> PROTECT CONDUCTORS TEMPORARILY DISCONNECTED FROM POWER SOURCE AND COILED ABOVE <br /> PANEL 07.REMOVE APPROXIMATELY 10 LIN.FT.OF CONDUIT AND TEMPORARILY CAP CONDUIT A SAFE <br /> DISTANCE FROM THE AREA OF CONSTRUCTION FOR THE SOUTH STAIR. <br /> 4 REMOVE CONDUIT AND WIRING FROM NORTH STAIR PULL BOX TO TRANSFORMER DISCONNECT. <br /> 5 REMOVE EXISTING TRANSFORMER,PANEL,CONTROL CABINETS.STORE/PROTECT FOR Z <br /> RE-INSTALLATION. <br /> O <br /> F__ <br /> U <br /> �D/ <br /> I-I_ <br /> PANEL 07 <br /> PANEL L07 EXIST. (/) <br /> LISPS BUILDING � <br /> U <br /> PL-8,10,12 O <br /> PL-2,4,6 <br /> 4 PL-13,15,17 <br /> Q' <br /> O <br /> Z <br /> 5 - - - - - - - - - - - - I <br /> PL-20,22- _ 6 PANEL'PL' <br /> �TRANSF.'TPL' <br /> M <br /> W <br /> V 0 <br /> PL-1,3,5 ,PL-7,9,11 <br /> Q <br /> O <br /> ELECTRICAL SITE PLAN-DEMOLITION <br /> NO. DATE BY REVISION DRAWN: NPR PROJECT NO.:2300590 <br /> 1cpff LISPS EVERETT PEDESTRIAN BRIDGE <br /> RUSHING EVERETT, WASHINGTON DESIGN: NPR SCALE: AS NOTED <br /> CHECKED: DATE: 12-08-2023 <br /> 1725 Westlake Ave N,Suite 300 DRAWING NO. <br /> 16015th Avenue,Suite 1600 Seattle,WA 98109 <br /> Seattle, 1 P:(206)285-71001 F:(206)285-7111 ELECTRICAL SITE PLAN - DEMOLITION E02 <br /> 206.622.5822 5822 <br /> www.kpff.co. rush1f19CO.com <br /> SHEET N0. OF <br />