Laserfiche WebLink
8 of 26 <br /> Monday, September 25, 2023 <br /> R <br /> llllllll11,.SCOPE OF WORK �. <br /> R&R CREW RESPONSIBILITIES & DETAILS: <br /> -Crew will install(10) Helical Piles and lift foundation to maximum allowable recovery. <br /> -Crew to install(40')of Tube Steel in 4'segments. <br /> -Crew will remove and repour(4)concrete holes to allow pile installation. <br /> -Crew will install (2)new Posts. <br /> HOMEOWNER RESPONSIBILITIES: <br /> -Have work area cleared where piles will be installed. <br /> - Homeowner not concerned with interior slab. <br /> ADDITIONAL INFO: <br /> -R&R will handle necessary permit and engineering coordination. <br /> -25%deposit,25%upon issue of permit and final 50%upon completion of project. <br /> -Permit cost is not included and will be billed on second 25%deposit payment. <br /> -Homeowner understands permit process may require the hiring of a Geotechnical Engineer and or a WABO certified special <br /> inspector billed at additional fees depending on municipality. <br /> -Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. <br /> -Permitting/scheduling times may vary beyond R&R control. <br /> MATERIAL CLAUSE: <br /> -Depth Clause:Piles are bid to 25' maximum depth. $20 per foot charge beyond that. <br /> -Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeowner <br /> approval. <br />