My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3928 FRIDAY AVE 2024-10-24
>
Address Records
>
FRIDAY AVE
>
3928
>
3928 FRIDAY AVE 2024-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 2:36:58 PM
Creation date
9/18/2024 9:24:50 AM
Metadata
Fields
Template:
Address Document
Street Name
FRIDAY AVE
Street Number
3928
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I of 5 <br /> LONGITUDE <br /> ONE TWENTYO <br /> ENGINEERING&DESIGN <br /> Pile Review for Structural Compliance <br /> Date: May 22nd, 2024 <br /> Project Name: Foundation Stabilization/Lift — Everett Project Number: S240104-1XR <br /> Project Location: 3928 Friday Ave, Everett, WA 98201 <br /> Client's Name: R&R Foundation Specialist, LLC <br /> To Whom It May Concern: <br /> The purpose of this letter is to confirm pile installation and capacity compliance with the structural re- <br /> quirements specified in the L120 Structural Calculation Package and Structural Site Plan dated March 41n <br /> 2024. <br /> During the week of May 21st, 2024, ten (10) helical piles were installed by R&R Foundation Specialists <br /> (R&R) to stabilize areas of the single-family residence located at 3928 Friday Ave, Everett, WA 98201. To <br /> the knowledge of L120, these piles were installed by R&R certified installers in accordance with the cited <br /> structural package, ESR-3750. Please refer to the attached drive log and photographs provided by R&R. <br /> The FOR from L120 Engineering and Design was present on site on May 21st 2024 during the pile installation. <br /> The helical piles were installed with maximum pile spacing of 6'-0"on-center, the typical minimum required <br /> vertical capacity as determined by L120 is shown in the table below. These demand requirements are as <br /> determined and specified in L120's structural calculation package cited above. <br /> PILE SPACING&LOAD REQUIREMENTS TABLE <br /> MAX O.C.SPACING,ft MIN VERTICAL CAPACITY,kips PROOF TESTING LOAD,kips <br /> 200'.%MIN VERTICAL <br /> PILE# PILETYPE LOCATION <br /> BTWN PILES END OFFSET ALLOWABLE LOADING CAPACITY <br /> (MIN ULTIMATE CAPACITY) <br /> 1 2 15.0 k/PILE 30.0 k/PILE GARAGE <br /> 1,8-10 HELICAL G' U" PFR PLAN 9.0k/PILE 18.0k/PILE EXT/INT <br /> 4-7 1 1 12.0 k/PILE 24.0 k/PILE EXT/INT <br /> Pile capacities for the helical piles have been calculated using a Digga HH-6K drive head with a torque <br /> correlation factor, Kt, of 9 as prescribed in ESR-3750. A chart showing the resulting capacities is attached <br /> to this letter. Per the attached document, an Ideal Foundation Systems 2-7/8" diameter helical pile installed <br /> to a minimum pressure of 1,000 psi results in a maximum allowable capacity of 14.0 kips including a safety <br /> factor of 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.