My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7423 LOWER RIDGE RD 2024-10-25
>
Address Records
>
LOWER RIDGE RD
>
7423
>
7423 LOWER RIDGE RD 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 8:16:16 AM
Creation date
9/18/2024 9:28:08 AM
Metadata
Fields
Template:
Address Document
Street Name
LOWER RIDGE RD
Street Number
7423
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> February 1,2024 <br /> Page 3 of 3 <br /> Limited Geotechnical Evaluation <br /> hard soils. Dependent on the pile size and the equipment used to install the anchors,an empirical <br /> factor is multiplied by the average torque over the final 3 feet of installation to estimate ultimate <br /> capacity. <br /> Allowable Helical Pier Compression Capacity Pa may be estimated from the following equation <br /> provided that the pier is in the recommended bearing soils: <br /> Pa=Kt x T/FoS, <br /> Where T is the applied torque, Kt is the empirical ratio factor. The following industry standards <br /> apply to shafts with blades spaced along the shaft at 2.5 to 3.5 times the average blade diameter on- <br /> center and meeting the manufacturer's specifications. <br /> 1.5"and 1.75"Square Shafts - Kt=9 ft-i <br /> 2.875"O.D.Round Shafts - Kt=9 ft-i <br /> 3.0"O.D.Round Shafts - Kt=8 ft-1 <br /> 3.5"O.D.Round Shafts - Kt=7 ft-1 <br /> Proof testing of at least three percent of the helical piers in eight equal increments up to 200 percent <br /> of the design load, if required by the permitting authority. Each load increment up to the 200 <br /> percent of design load should be held for five(5)minutes and the vertical strain monitored. If the <br /> total strain between 1 and 5 minutes is less than o.04 inches,the helical pier may be considered <br /> acceptable. If the recorded strain exceeds o.04 inches,the helical pier should either be deepened <br /> and retested or abandoned and a new helical pier shall be installed and tested. <br /> Closure <br /> The information presented herein is based upon professional interpretation utilizing standard <br /> practices and a degree of conservatism deemed proper for this project. We emphasize that this <br /> report is valid for this project as outlined above and for the current site conditions and should not <br /> be used for any other site. <br /> Sincerely, <br /> Cobalt Geosciences,LLC <br /> 40% tic WAS <br /> , <br /> �/ <br /> n <br /> -off 54896 <br /> iSt`'OHM. <br /> 2/1/2024 <br /> Phil Haberman,PE,LG,LEG <br /> Principal <br /> Figure 1;Site Plan <br /> Figure 2;Repair Plan <br /> Figure 3;Hand Boring Log <br /> www.cobaltgeo.com (206)331-1097 <br /> Iri <br />
The URL can be used to link to this page
Your browser does not support the video tag.