My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TABLE OF CONTENTS NOTE: PDF FILL-ABLE WSDOT FORMS FOUND AT https://www.wsdot.wa.gov/forms/pdfForms.html MAY BE SUBSTITUED FOR PROVIDED FORMS IF MATCHING FORM NUMBER AND REVISION DATE IS USED. COVER SIGNATURE PAGE VICINITY MAP NOTICE TO CONTRACTORS TABLE OF CONTENTS INSTRUCTIONS TO BIDDERS TABLE OF CONTENTS FOR SPECIAL PROVISIONS SPECIAL PROVISIONS BID PROPOSAL: LETTER TO COUNCIL BID ITEM TABLE PROPOSAL SIGNATURE SHEET CITY OF EVERETT RCW 35.22.650 NON-COLLUSION DECLARATION (272-036I, 07/11) BID GUARANTY AND BID BOND PROPOSAL FOR INCORPORATING RECYCLED MATERIALS INTO THE PROJECT (REV 1/8/16) CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES CONTRACT: CONTRACT WITH SIGNATURE PAGE PERFORMANCE BOND (272-002A, 12/19) PAYMENT BOND (272-003A, 12/19) APPENDICES: A) L&I POLICY STATEMENT BENEFITS CODE KEY STATE PREVAILING WAGES B) PUGET SOUND CLEAN AIR AGENCY EXCERPTS OF AIR QUALITY RULES C) SAMPLE CHANGE ORDER FORMS; AGREED AND UNILATERAL D) STANDARD DRAWINGS
The URL can be used to link to this page
Your browser does not support the video tag.