My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT, WASHINGTON CONTRACT PROVISIONS FOR WORK ORDER NO.: PW 3741 18TH STREET PEDESTRIAN IMPROVEMENTS INSTRUCTIONS TO BIDDERS PW# 3741 1 July 3, 2024 INSTRUCTIONS TO BIDDERS 1.0 Design Engineer Questions and inquiries about these Contract Provisions should be directed to the attention of Gina Loring, (425) 257-7290 or gloring@everettwa.gov. 2.0 Bidder’s Check List The bidder’s attention is directed to the following City-provided forms which must be executed in full and submitted with the bid as required: 1. Proposal: The lump sum and unit price items must be shown in the space provided. Show unit prices in figures. 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. 3. RCW 35.22.650 Certification: To be filled in and signed by the bidder. 4. Non-Collusion Declaration: To be submitted with the bid. 5. Bid Bond: This form provided by the City is to be executed by the Bidder and the surety company unless bid is accompanied by a certified check or cashier’s check. The amount of this bond shall be not less than five percent (5%) of the total amount bid and may be shown in dollars or on a percentage basis. Cash will not be accepted. 6. Proposal For Incorporating Recycled Materials Into The Project: To be filled in and signed by the bidder. Failure to complete the aforementioned forms and to submit the forms with the bid as required may be due cause for rejection of bid. All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal Code, “Bid Protest Procedures.” 3.0 Pre-Award Forms The following form is required to be signed and submitted prior to award of Contract: 1. Certification of Compliance with Wage Payment Statutes: To be filled in and signed. This certification is not required to be submitted with the bid proposal and may be submitted after bid opening. The Contract cannot be awarded without this certification. 4.0 Contract Forms The following forms are to be executed and/or delivered after the award of Contract: 1. Contract: This Contract to be executed by the successful bidder with the City’s AdobeSign system within twenty (20) calendar days after the award date.
The URL can be used to link to this page
Your browser does not support the video tag.