My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 34 email with delivery confirmation from the Contracting Agency to the Contractor, which will 1 provide 30 calendar days for the Contractor to submit the necessary documents. The 30 2 calendar day period will begin on the date the email with delivery confirmation is received 3 by the Contractor. The date the Contracting Agency unilaterally signs the Final Contract 4 Voucher Certification shall constitute the Completion Date and the final acceptance date 5 (Section 1-05.12). The reservation by the Contracting Agency to unilaterally accept the 6 Contract will apply to Contracts that are Physically Completed in accordance with Section 7 1-08.5, or for Contracts that are terminated in accordance with Section 1-08.10. Unilateral 8 final acceptance of the Contract by the Contracting Agency does not in any way relieve 9 the Contractor of their responsibility to comply with all Federal, State, tribal, or local laws, 10 ordinances, and regulations that affect the Work under the Contract. 11 12 Payment to the Contractor of partial estimates, final estimates, and retained percentages 13 shall be subject to controlling laws. 14 15 1-10.GR1 16 Temporary Traffic Control 17 18 1-10.2.GR1 19 Traffic Control Management 20 21 1-10.2(1).GR1 22 General 23 24 1-10.2(1).INST1.GR1 25 Section 1-10.2(1) is supplemented with the following: 26 27 1-10.2(1).OPT1.GR1 28 (October 3, 2022) 29 The Traffic Control Supervisor shall be certified by one of the following: 30 31 The Northwest Laborers-Employers Training Trust 32 27055 Ohio Ave. 33 Kingston, WA 98346 34 (360) 297-3035 35 https://www.nwlett.edu 36 37 Evergreen Safety Council 38 12545 135th Ave. NE 39 Kirkland, WA 98034-8709 40 1-800-521-0778 41 https://www.esc.org 42 43 The American Traffic Safety Services Association 44 15 Riverside Parkway, Suite 100 45 Fredericksburg, Virginia 22406-1022 46 Training Dept. Toll Free (877) 642-4637 47 Phone: (540) 368-1701 48 https://atssa.com/training 49 50 Integrity Safety 51 13912 NE 20th Ave. 52
The URL can be used to link to this page
Your browser does not support the video tag.