My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 41 1 Do not place HMA on any wet surface, or when the average surface temperatures are 2 less than those specified below, or when weather conditions otherwise prevent the 3 proper handling or finishing of the HMA. 4 5 Minimum Surface Temperature for Paving 6 Compacted Thickness (Feet) Wearing Course Other Courses Less than 0.10 55◦F 45◦F 0.10 to .20 45◦F 35◦F More than 0.20 35◦F 35◦F 7 5-04.3(2) Paving Under Traffic 8 When the Roadway being paved is open to traffic, the requirements of this Section 9 shall apply. 10 11 The Contractor shall keep intersections open to traffic at all times except when paving 12 the intersection or paving across the intersection. During such time, and provided that 13 there has been an advance warning to the public, the intersection may be closed for the 14 minimum time required to place and compact the mixture. In hot weather, the Engineer 15 may require the application of water to the pavement to accelerate the finish rolling of the 16 pavement and to shorten the time required before reopening to traffic. 17 18 Before closing an intersection, advance warning signs shall be placed and signs shall 19 also be placed marking the detour or alternate route. 20 21 During paving operations, temporary pavement markings shall be maintained throughout 22 the project. Temporary pavement markings shall be installed on the Roadway prior to 23 opening to traffic. Temporary pavement markings shall be in accordance with Section 8-24 23. 25 26 All costs in connection with performing the Work in accordance with these requirements 27 shall be included in the unit Contract prices for the various Bid items involved in the 28 Contract. 29 30 5-04.3(3) Equipment 31 32 5-04.3(3)A Mixing Plant 33 Plants used for the preparation of HMA shall conform to the following requirements: 34 35 1. Equipment for Preparation of Asphalt Binder – Tanks for the storage of 36 asphalt binder shall be equipped to heat and hold the material at the required 37 temperatures. The heating shall be accomplished by steam coils, electricity, or 38 other approved means so that no flame shall be in contact with the storage tank. 39
The URL can be used to link to this page
Your browser does not support the video tag.