My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18TH STREET PEDESTRIAN IMPROVEMENTS 3741 RMT July 03, 2024 70 24) ASTM D6241 Standard Test Method for Static Puncture Strength of Geotextiles 1 25) ASTM D6574 Standard Test Method for Determining the (In-Plane) Hydraulic 2 Transmissivity of a Geosynthetic by Radial Flow 3 26) ASTM D6637 Standard Test Method for Determining Tensile Properties of 4 Geogrids by the Single or Multi-Rib Tensile Method 5 27) ASTM D6638 Standard Test Method for Determining Connection Strength 6 Between Geosynthetic Reinforcement and Segmental Concrete Units (Modular 7 Concrete Blocks) 8 28) ASTM D6706 Standard Test Method for Measuring Geosynthetic Pullout 9 Resistance in Soil 10 29) ASTM D6916 Standard Test Method for Determining the Shear Strength 11 Between Segmental Concrete Units (Modular Concrete Blocks) 12 30) ASTM D8102 Standard Practice for Manufacturing Quality Control of 13 Geotextiles 14 15 American Association of State Highway and Transportation Officials (AASHTO) 16 1) AASHTO M252 Corrugated Polyethylene Drainage Pipe 17 2) AASHTO M288 Standard Specification for Geotextile Specification for Highway 18 Applications 19 20 8-26.1(2) Quality Assurance Submittals 21 Contractor shall submit a list of five (5) previously constructed projects of similar size 22 and magnitude by the wall installer where the specific retaining wall system has been 23 constructed successfully. Contact names and telephone numbers shall be listed for 24 each project. 25 26 Contractor shall submit a Manufacturer's certification, prior to start of work, that the 27 retaining wall system components meet the requirements of this specification and 28 the structure design. 29 30 Contractor shall submit certificate of compliance for each lot of bond breaker material 31 delivered. 32 33 Contractor shall submit a sample of each different unit for approval. 34 35 Contractor shall provide soil testing and quality assurance inspection during 36 earthwork and wall construction operations. Contractor shall provide quality control 37 testing and inspection during construction. Owner's quality assurance program does 38 not relieve the contractor of responsibility for quality control and wall performance. 39 40 8-26.1(3) Delivery, Storage and Handling 41 Contractor shall check all materials upon delivery to assure that the proper type, 42 grade, color, and certification have been received. 43 44 Contractor shall protect all materials from damage due to job site conditions and in 45 accordance with manufacturer's recommendations. Damaged materials shall not be 46 incorporated into the work. 47 48 8-26.2 Materials 49 8-26.2(1) Base Leveling Pad 50 Base Leveling Pad Material shall consist of crushed surfacing base course per 51 WSDOT Standard Specification 9-03.9(3) and as shown on the construction drawings. 52
The URL can be used to link to this page
Your browser does not support the video tag.