My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moeco LLC 9/18/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Moeco LLC 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 10:37:00 AM
Creation date
9/18/2024 10:27:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Moeco LLC
Approval Date
9/18/2024
Council Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
18th Street Pedestrian Improvements
Tracking Number
0004515
Total Compensation
$329,191.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be typed or entered in ink. BID SCHEDULE: 18th Street Pedestrian Improvements BIDDER:___________________________ Item No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT 1 Mobilization LS 1 $___________.___ $______________.___ 2 ADA Features Surveying LS 1 $___________.___ $______________.___ 3 SPCC Plan LS 1 $___________.___ $______________.___ 4 Erosion Control and Water Pollution Prevention LS 1 $___________.___ $______________.___ 5 Street Cleaning HR 43 $___________.___ $______________.___ 6 Inlet Protection EA 7 $___________.___ $______________.___ 7 High Visibility Silt Fence LF 125 $___________.___ $______________.___ 8 Project Temporary Traffic Control LS 1 $___________.___ $______________.___ 9 Traffic Control Supervisor LS 1 $___________.___ $______________.___ 10 Flaggers (Min. Bid $75/Hr.) HR 688 $___________.___ $______________.___ 11 Clearing and Grubbing LS 1 $___________.___ $______________.___ 12 Sawing Pavement LF 652 $___________.___ $______________.___ 13 Removal of Structures and Obstructions LS 1 $___________.___ $______________.___ 14 Roadway Excavation Incl. Haul CY 427 $___________.___ $______________.___ 15 Structure Excavation Class B Incl. Haul CY 220 $___________.___ $______________.___ 16 Gravel Backfill for Foundation Class B CY 40 $___________.___ $______________.___ 17 Controlled Density Fill CY 20 $___________.___ $______________.___ 18 Crushed Surfacing Base Course TON 60 $___________.___ $______________.___ 19 HMA Cl. 1/2" PG 64-22 Pavement Patch TON 17 $___________.___ $______________.___ 20 High-Density Polyethylene (HDPE) Storm Pipe, 6 In. Diam. LF 40 $___________.___ $______________.___ 21 High-Density Polyethylene (HDPE) Storm Pipe, 12 In. Diam. LF 32 $___________.___ $______________.___
The URL can be used to link to this page
Your browser does not support the video tag.