My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Service Electric Co., Inc. 9/18/2024
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Service Electric Co., Inc. 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 11:25:13 AM
Creation date
9/18/2024 1:21:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Service Electric Co., Inc.
Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
16th Street and Broadway Traffic Signal Pole and Foundation
Tracking Number
0004516
Total Compensation
$54,581.84
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />in the Work all materials and equipment stored at the worksite or for which the City has <br />paid the Contractor but which are not yet on the worksite. In such case, the Contractor <br />will not be entitled to receive any further payment until the Work is finished. At the <br />City’s sole option, Contractor shall assign and transfer any contractual rights to material <br />and equipment to be installed, incorporated, or used in the performance of the Work. <br />The City shall credit Contractor for the reasonable, fair market rental value of any and all <br />Contractor-owned equipment for so long as retained and used by the City. The City <br />shall credit Contractor for all materials and supplies on the worksite or on order, but not <br />yet paid for by City, provided that ownership is transferred and assigned to the City and <br />the materials and supplies conform to the requirements of the Contract Documents. <br />(2) If the unpaid balance of the Contract Price exceeds the direct and indirect cost of the <br />completed Work, including construction management services, such excess shall be paid <br />to the Contractor. If such costs exceed such unpaid balance, the Contractor shall pay <br />the difference to the City. Such costs incurred by the City will be verified by the City and <br />incorporated into a change order, but in finishing the Work, the City may negotiate for <br />materials, equipment, and services to complete the Work and will not be required to <br />obtain the lowest figure for Work performed. <br />(3) Where the Contractor services have been so terminated by the City, the termination <br />shall not affect any rights of the City against the Contractor then existing or which may <br />thereafter accrue. Any retention or payment of monies due to the Contractor by the <br />City will not release the Contractor from liability. <br />(4) If the City terminates this Contract for default, and it is thereafter determined that the <br />Contractor had not so failed to perform its obligations or defaulted in any way, the <br />termination shall then be deemed to have been made for the convenience of the City <br />pursuant to subsection B. below, Termination for Convenience. <br />B. Termination for Convenience. Without prejudice to any other remedy it may have under law or <br />and/or the provisions of the Contract, the City may terminate this Contract for convenience, <br />with or without cause, in whole or in part, at any time by giving written notice to the Contractor. <br />Termination will be effective upon receipt of such notice by the Contractor. The Contractor shall <br />immediately discontinue Work and take all reasonable steps with its suppliers and <br />subcontractors to minimize cancellation charges and other costs. <br />(1) After termination for convenience, payment to the Contractor shall only be for Work <br />completed through the termination date. <br />(2) To the extent not paid for by the Contract Price for completed Work, the City will pay as <br />part of an adjustment of Contract Price those direct costs necessarily and actually <br />incurred by the Contractor in reasonable anticipation of performing the Work that has <br />been deleted or terminated. <br />(3) No claim for damages of any kind for loss of anticipated profits or consequential <br />damages will be allowed because of termination for convenience. <br />(4) In no event will the total payment to the Contractor exceed the total Contract Price as <br />modified by approved change orders less those amounts paid to the Contractor before <br />the effective date of the termination.
The URL can be used to link to this page
Your browser does not support the video tag.