My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Service Electric Co., Inc. 9/18/2024
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Service Electric Co., Inc. 9/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 11:25:13 AM
Creation date
9/18/2024 1:21:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Service Electric Co., Inc.
Approval Date
9/18/2024
Department
Public Works
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
16th Street and Broadway Traffic Signal Pole and Foundation
Tracking Number
0004516
Total Compensation
$54,581.84
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 1 of 1 <br /> <br /> Service Electric Co., Inc. • 1615 First Street • P.O. Box 1489 • Snohomish, WA 98291 <br /> SERVIEC564RU/UBI 179-023-787 • 360-568-6966 • 360-568-9283 fax <br /> <br /> <br /> <br /> <br /> <br />September 10, 2024 <br /> <br /> <br />Mr. Corey N. Hert, P.E. <br />City Traffic Engineer/Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />C: 425-328-0640 <br />Chert@everettwa.gov <br /> <br />Re: 16th & Broadway SE Corner Rebuild, Everett, WA 98201 <br /> <br />Mr. Hert: <br /> <br />Service Electric Co., Inc. is pleased to extend our bid proposal for 16th & Broadway SE Corner <br />Rebuild Project. Our bid proposal is quoted per e-mail dated 9-10-24 from Corey Hert. <br /> <br />SCOPE OF WORK PER E-MAIL DATED 9-10-24 FROM COREY HERT = $ 49,665.00 <br /> <br />Includes: 1. Traffic Control. 2. New Signal Pole Foundation. 3. Supply & Installation of <br /> Conduit & Wiring. 4. Installation of New Signal Pole and Signal Equipment <br /> Supplied by Others. 5. Electrical Permit. 6. Temporary Sidewalk Patch. 7. USE Tax. <br /> <br />Exclusions: <br />Bond Premium Fee Supply of Signal Pole & Signal Equipment <br />Sidewalk Patching Staking Survey & Layout <br />Site Restoration Overtime/Shiftwork <br />Sales Tax <br /> <br /> Service Electric will provide no other insurance coverage other than our current coverage. A <br />sample insurance certificate is available from our office upon request. If requested, we will <br />seek additional coverages at actual cost, if available. <br /> <br /> Service Electric will accept no defense/indemnity except to pay damages to the extent <br />caused by our own negligence or fault. <br /> <br /> These exclusions supersede any language in Contractor’s host document. <br /> <br />Thank you for the opportunity to provide this proposal. We look forward to working with you <br />on this project. <br /> <br />Very truly yours, <br />Andy Powers <br />Andy Powers <br />Estimator – Cell: 206-419-1826
The URL can be used to link to this page
Your browser does not support the video tag.