My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/09/18 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/09/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 7:45:26 AM
Creation date
9/19/2024 7:42:20 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />6 <br /> <br />to be paid to the Property’s seller at closing unless the title company is <br />irrevocably committed at closing to issue a lender’s title insurance <br />policy in the amount of the Property’s purchase price, with policy form <br />and exceptions acceptable to the City in its sole discretion. <br />i. Unless the County and City have approved a priority/subordination <br />agreement and such agreement is recorded at Closing, the City will, <br />through its escrow instructions, require that the following documents <br />be recorded in the following order at Closing without any intervening <br />recorded document: (i) deed, (ii) Restrictive Covenant, and (iii) Deed of <br />Trust. All fees associated with recording documents are the <br />responsibility of EGM. <br />C. Funding of Allowable Project Costs. <br />To the extent that Loan funds remain after acquisition funding, those remaining <br />Loan funds will be disbursed to EGM to reimburse Allowable Project Costs as <br />follows: <br />1. “Allowable Project Costs” are costs approved by the City and County necessary <br />to prepare the Property for the Project, subject to the following limitations and <br />clarifications: <br />a. Unless pre-approved by both County and City in writing, Allowable <br />Project Costs do not include any costs for construction, alteration, <br />enlargement, improvement, repair, or demolition. <br />b. Examples of Allowable Project Costs include design costs, permitting <br />costs, bed purchase costs, and furniture purchase costs as necessary <br />for the Project. However, costs are only allowable to the extent directly <br />attributable to preparation of the Property for the Project. For <br />example, if EGM’s design costs include costs for design of <br />improvements/buildings on the Property that include more than what <br />is necessary for the Project, reimbursement under this Agreement will <br />be limited to those design costs necessary for the Project. <br />2. EGM will submit requests for reimbursement to the City, which the City will <br />provide to the County. Reimbursement requested by EGM of will not be <br />paid to EGM unless both City and County approve the EGM reimbursement <br />request. <br />3. Loan funds for Allowable Project Costs will not be disbursed to EGM until <br />after EGM owns the Property. <br />4. Unless determined otherwise by the County and City, Loan funds for <br />Allowable Project Costs will be disbursed solely on a reimbursement basis. <br />5. Loan funds may reimburse costs for Allowable Project Costs incurred <br />between June 1, 2024 and the date EGM takes ownership of the Property, <br />but reimbursement will not be paid until after such ownership date. <br />6. Reimbursement requests must be submitted by EGM as required by the <br />City. EGM must submit the Invoice in the form of Attachment 3 to the City- <br />County ILA. The City may require EGM to use the City Amplifund system.
The URL can be used to link to this page
Your browser does not support the video tag.