Laserfiche WebLink
R311.2 Means of Egress <br />YES <br />NO <br />R311.2 Door must be side -hinged with min. width of 32 inches between face of door and stop. Height not less than 78 inches. <br />1171 <br />R330.4 Operable parts of door handles, pulls, latches, locks and other devices installed in AFH shall be operable with one hand <br />and shall not require tight grasping, pinching or twisting of the wrist (lever -type). <br />a <br />Q <br />R330.4 Required exit door hardware shall unlock inside and outside mechanisms when exiting the building allowing re-entry <br />■ <br />Q <br />without use of key, tool or special knowledge. <br />R311.7 Stairways <br />I N/A N I <br />YES <br />NO <br />R311.7.5.1 Riser Height: Max riser height shall be 7 Y. inches (8 inches in structures built prior to July 1, 2004) <br />R311.7.5.2 Tread Depth: Min. tread depth shall be in 10 inches (9 inches in structures built prior to July 1, 2004) <br />Q <br />13 <br />R330.10.1 Handrails for Treads and Risers shall be installed on both sides of treads and risers numbering from one riser to multiple <br />risers. Handrails shall be installed in accordance with R311.7.8.1— R311.7.8.4 <br />R330.8 Grab Bars In Bathrooms I N/A 131 <br />YES <br />NO <br />Grab bars shall be installed for all water closets (toilets), bathtubs and showers according to R330.8. <br />Water Closets (toilet) shall have grab bars installed on both sides according to R330.8.3 <br />Bathtubs shall have two vertical and three horizontal grab bars installed according to R330.8.4 <br />Shower stalls have two vertical and horizontal grab bars mounted on all sides of shower according to R330.8.5 <br />0 <br />Shower stalls must be minimum size of 30 inches deep by 48 inches long (R330.11) <br />13 <br />JR PASSED <br />NAME OF AFH: <br />Adult Family Home Project Address <br />M-M A -x HM�,c s <br />BUILDING DEPT. INSPECTOR'S NAME (PRINT) <br />2 <br />BUILDI DEPT. INSPECTOR'S SIGNAf URE DATE: <br />l <br />32oa (� Q , �.i��r, �✓,� 12�.2s7 �8�0 <br />BUILDING DEPT. OFFICE ADDRESS OFFICE PHONE NUMBER: <br />Application and inspection checklist developed by Washington Association of Building Officials (WABO), In cooperation with Department of Social and <br />Health Services (DSHS) for use by both departments and licensors In accordance with WAC 388-76-10700. <br />Implementation Date: 2021 February 01 <br />Updated: 2021 February <br />