My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7008 COLBY AVE 2024-11-01
>
Address Records
>
COLBY AVE
>
7008
>
7008 COLBY AVE 2024-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 11:49:53 AM
Creation date
9/19/2024 1:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
7008
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A & E Insulation, Inc. <br /> 15205 39th Avenue NE <br /> Marysville, WA 98271 <br /> Office: (360) 651-1058 Fax: (360) 651-1259 <br /> Website: www.aeinsulation.com <br /> Date: 11/21/23 <br /> Builder or Owner Paul Korenovsky <br /> House address or lot #: 7008 Colby Ave, Everett <br /> Ring (if applicable): Open A B C <br /> Air Leakage Testing (Blower Door Test) <br /> Conditioned Floor Area: 1,757 Calculated Volume (Cubic Feet) <br /> Ceiling Height (ft) 8.5 14,935 <br /> Standard Tested CFM50 Test Result (ACH50) <br /> <_5.0 ACH50 <br /> 701 2.$2 <br /> ((CFM50X 60)/Conditioned Volume) <br /> Signature <br /> Glossary <br /> Pascal (pa): Unit of pressure <br /> CFA: Conditioned floor area in square feet <br /> CFM50: Cubic feet per minute of air leakage at 50 pascals of pressure <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Conditioned Volume: Volume of conditioned space (CFA X ceiling hieght) <br /> ACH50: Air changes per hour at 50 pascals of pressure <br /> Air Leakage Testing Code Language <br /> R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not <br /> exceeding 5 air changes per hour.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 <br /> Pascals). For this test only,the volume of the home shall be the conditioned floor area in ft2 (m2 ) multiplied by 8.5 feet <br /> (2.6 m).Where required by the code official,testing shall be conducted by an approved third party.A written report of <br /> the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be <br /> performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has <br /> confirmed sealing(see Table R402.4.1.1),operable windows and doors manufactured by small business shall be <br /> permitted to be sealed off at the frame prior to the test. During testing: 1. Exterior windows and doors,fireplace and <br /> stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control <br /> measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed <br /> beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test,shall be open, access <br /> hatches to conditioned crawl spaces and conditioned attics shall be open.4. Exterior or interior terminations for <br /> continuous ventilation systems and heat recovery ventilators shall be sealed. 5. Heating and cooling systems, if installed <br /> at the time of the test,shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully <br /> open. Exceptions: 1. Additions less than 500 square feet of conditioned floor area. 2.Additions tested with the existing <br /> home having a combined maximum air leakage rate of 7 air changes per hour.To qualify for this exception,the date of <br /> construction of the existing house must be prior to the 2009 Washington State Energy Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.