Laserfiche WebLink
<br />00 5213 - 1 <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, a <br />municipal corporation existing under the laws of the State of Washington (the “City”) and Allied <br />Plumbing & Pumps LLC DBA Allied Trenchless, (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br />to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and/or appurtenances in accordance with the <br />Specifications and Drawings and all other Contract Documents entitled: “20th Street Sewer <br />Rehabilitation Project” (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General Conditions. <br />The Contract Documents are part of this Contract and are hereby incorporated by reference. <br />Terms that are capitalized in a Contract Document but not defined in that Contract Document <br />shall have the meaning defined to them in the other Contract Documents. A copy of the <br />Contract Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br />Link to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1725237&searchid=184f520c- <br />5342-49be-bd23-96389a1dc9c6&dbid=0 <br /> <br />This is a 439-page pdf digitally signed by the City of Everett at 2024.07.08 <br />09:51:03 -7’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted Contract <br />Documents as of the Bid Opening Date. City and Contractor further agree that this pdf may <br />contain some other documents (such as Reference Information) that are not Contract <br />Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within One <br />Hundred Eighty (180) calendar days after the effective date of the Notice to Proceed. Physical <br />Completion shall be within One Hundred Twenty (120) calendar days after the actual date of <br />issuance of Substantial Completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put to <br />additional expense in the event that the Contractor does not complete the Work in all respects <br />and have it ready for use by the Substantial and Physical Completion dates stated above. <br />Because it is difficult to accurately compute the amount of such costs and damages, the <br />Contractor hereby covenants and agrees to pay to the City liquidated damages for each and <br />every calendar day (or working day, if Contract Time is described in working days) in the <br />amounts set forth in this Section. For failure to achieve Substantial Completion by the <br />Substantial Completion date stated above, the Contractor shall pay liquidated damages to the